My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
3500 - Local Oversight Program
>
PR0545207
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:49:37 PM
Creation date
1/27/2020 3:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545207
PE
3528
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
02
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF TRACY <br /> 11/23/2009 09:21 FAX 209 831 B - <br /> C v <br /> "pop -CITY OFT AC i SelviCOs Telephone: {209?831-64M <br /> " Depaetlt of Derâ–ºelopment and Engineering <br /> Fax: (209)8314439 <br /> 333 alvic <br /> enter PIS <br /> Tracy,GA <br /> October 13,2009 <br /> STANTEC CONS'ULTINCi CORPORATION <br /> 30171Cilgore Road <br /> Suite 100 <br /> Rancho Cordova,CA.95670 <br /> ATTN:Colin Ryan,Geologic Project Specialist <br /> Street.following monitoring well removal at South Side <br /> SUBJECT:Remediation of City &Toste <br /> Grant Line Road front of Carl's JR.Restaurant between Joe Pombo Parkway <br /> Road <br /> . -Dear Colin, <br /> at two and a half feet from the south edge of pavement <br /> The center of this well is located llowing criteria should met for remediation of street <br /> and concrete lip of oval of the well. <br /> pavemont following <br /> feet around <br /> vement a minimum of 2 i x Wei&eastotf the <br /> is <br /> along the <br /> 1) Saw cut the existing pa u /z feet north, <br /> concrete lip of gutter and minimum 2 <br /> well center- <br /> of the top five feet and casing removal,the first comae <br /> 2) Following the over drilling spa halt concrete thiclmess. <br /> of asphalt concrete will be 2 inches <br /> the existing <br /> 3 over the first course of asphalt concrete,install trupave(or equal)polyester non- <br /> woven reinforcing fabric with an SS-1h tack coal. <br /> roved reinforcing fabric will be applied <br /> 4) The final asphalt concrete over and the edges fog sealed as required <br /> flush smooth to match exis <br /> ting <br /> by Tracy <br /> ting <br /> standard specifications section 203,.attached here. <br /> not mentioned here,and requested by the city inspector <br /> 5 Any other requirements . <br /> Feel free to call with any questions, <br /> Armando Salaiz <br /> Engineering Technician I1 <br /> (209)831-6435 <br />
The URL can be used to link to this page
Your browser does not support the video tag.