My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
3500 - Local Oversight Program
>
PR0545207
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 3:47:44 PM
Creation date
1/27/2020 3:40:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545207
PE
3528
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
02
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ECOR <br /> 7-Eleven Store #32262 d InRemtiOn <br /> Work Plan for Additional Site Assessment <br /> ,March 19, 2004 C.v �' � <br /> Page 7 <br /> GROUNDWATER MONITORING AND SAMPLING <br /> uarterly <br /> and <br /> Wells MW-7, MW-8, and MW-9 will be incorporated in the grnto the goundwaterrmonditoatwelhwilltbe taken, <br /> program. Prior to sampling, depth to water <br /> Each well will be sampled by purging approximately 3 casing volumes of water using a downhole <br /> pump or hand bailer until groundwater parameters of pH, temperature, <br /> and conductivity stabilized as <br /> measured by portable meters calibrated to a standard buffer and conductivity standard. <br /> Groundwater samples will then be collected by lowering a clean disposable bailer into the well <br /> and <br /> collecting a representative sample of the formation water. If the well is slow to recover, <br /> the sample <br /> will not be collectedslowlyuntil <br /> transfe ed tolevel <br /> laboratory-cleaned level. <br /> o 40 mL VOAs, sealed with Tef on1 ned caps, <br /> sample <br /> will be <br /> and transferred to cooled storage. <br /> Groundwater samples will be submitted to Kiff Analytical, a California certified laboratory, for analysis <br /> of BTEX, TPHg, MtBE, and,TBA, DIPE, EtBE, and TAME by EPA Method 8260B. <br /> WASTE HANDLING AND STORAGE <br /> During drilling operations, all augers, sampling tools, and down hole equipment will be steam <br /> cleaned prior to use. All rinsate water, purge water and soil cuttings generated during the drilling <br /> operations will be stored in 55-gallon drums at the site pending laboratory analysis for proper <br /> disposal. <br /> FEASIBLITY TESTING AND INTERIM REMEDIATION <br /> Feasibility Tests <br /> In order to minimize the migration of contaminants offsite, SECOR will conduct separate oxygen <br /> injection and groundwater extraction feasibility tests at the site. <br /> sc�toior <br /> Oxygen injection Feasibility Test � „r <br /> SECOR proposes to conduct an oxygen injection test using the proposed injection well, S-1. <br /> Approximately 150 to 300 cubic feet (ft) of oxygen will be injected into well S-1 (Figure 5). Z- Ifv�� <br /> Dissolved oxygen (DO) readings will be taken'from S-1, MW-5, and EX-1 with a DO meter equipped botft.."' , <br /> with a down hole probe before, immediately following, and approximately one day after the injection ec.%MA � <br /> event. During injection, the oxygen flow rate and injection pressures will be recorded. Lower <br /> explosive limit (LEL) oxygen readings will also be collected in well MW-5 and EX-1 before and after <br /> oxygen injection. Data collected during the test will be used to determine the oxygen injection radius <br /> of influence. SECOR expects to inject oxygen for approximately two hours. <br /> If DO readings measured in MW-5 and EX-1 show a significant increase from baseline levels, <br /> oxygen injection may be used as an interim remedial approach to destroy dissolved MtBE by <br /> stimulating biologic activity within the saturated zone. <br /> Groundwater Extraction Step-Draw Down and Constant Discharge Feasibility Test <br /> In preparation for the groundwater extraction test, a 6,900-gallon holding tank will be set at the site <br /> adjacent to the extraction well. A 3-inch diameter electric submersible groundwater pump, controller, <br /> and generator will be used to extract groundwater from EX-1. The pump will be set 1 foot off the <br /> bottom of the well and depth to the pump intake from top of casing will be recorded. A valve and <br /> flow meter connected in-line with the discharge hose will be used to control and measure flow rate. <br /> 32262 Offsite well install and interim remediation workplan.doc SECOR international incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.