My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002183
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
3500 - Local Oversight Program
>
PR0545207
>
ARCHIVED REPORTS_XR0002183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 4:06:05 PM
Creation date
1/27/2020 3:50:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002183
RECORD_ID
PR0545207
PE
3528
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
02
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C 0 R f <br /> DATE May 12, 2004 <br /> 7-ELEVEN, INC. QUARTERLY REPORT <br /> Store Number 7-Eleven Store#32262 <br /> Site Address 2360 West Grant Line Road, Tracy, CA <br /> 7-Eleven Contact Mr Ken Hilliard <br /> Consulting Company SECOR International, Inc —Mr JafFAuchterlonie <br /> SECOR Project No 77EL 32262 04 <br /> Primary Agency San Joaquin County Environmental Health Department (SJCEHD) <br /> WORK PERFORMED THIS QUARTER [First—20041 <br /> 1 Conducted groundwater monitoring and sampling of sig,wells on January 14, 2004 <br /> 2 Prepared quarterly groundwater sampling report <br /> 3 Submitted work plan for additional lateral and vertical delineation of dissolved methyl-tert-butyl ether <br /> (MtBE), and feasibility testing for interim remediation <br /> WORK PROPOSED FOR NEXT QUARTER [Second--2004] <br /> 1 Perform quarterly groundwater sampling and prepare report <br /> 2 Install monitoring wells and advance borings for additional lateral and vertical delineation of dissolved <br /> MtBE, and feasibility testing for interim remediation <br /> DISCUSSION <br /> The site is currently an operating 7-Eleven convenience store and gasoline station Two 10,000- <br /> gallon underground storage tanks (USTs) and one 15,000-gallon UST are located in the <br /> southeastern portion of the property (Figures 1 and 2) The current groundwater monitoring and <br /> • sampling data are summarized in Table 1, and presented on Figure 2 Historical groundwater <br /> monitoring and sampling results are summarized in Table 2 The well completion details are <br /> summarized in Table 3 <br /> Current Site Information <br /> Current Phase of Project Groundwater Monitoring <br /> Frequency of Monitoring and Sampling Quarterly, Six wells- MW-1 through MW-5 <br /> and MW-6D <br /> Are Liquid Phase Hydrocarbons Present On-site No <br /> Water Supply Wells within a 2,000-foot radius and their <br /> Respective Direction , None <br /> Current Remediation Techniques None <br /> Permits for Discharge None <br /> Historic Range in Depth to Water, 04-03 to Q1-04 MW-1, 8 76 to 9 24 feet bgs <br /> Current Quarter Monitoring Data (See Figure 2 and Table 1) <br /> Wells Monitored and Sampled Six wells- MW-1 through MW-5 and MW- <br /> 6D <br /> Dissolved Oxygen Readings Collected From Six wells- MW-1 through MW-5 and MW- <br /> 6D <br /> Approximate Depth to Groundwater(DTW) 6 44 to 8 77 ft bgs _ <br /> Average Change in Groundwater Elevation Since Last T <br /> • Event 0 56 foot increase <br /> Groundwater Flow Direction and Gradient Northwest @ 0.005 feet per foot(Figure 2) <br /> 32262 04-10 Report doc ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.