Laserfiche WebLink
. 7-Eleven Store#32262 <br /> Work Plan for Additional Site Assessment and Interim Remediation <br /> March 19, 2004 <br /> Page 6 <br /> r <br /> delivery to Kiff Analytical in Davis, California Soil samples will be collected following the soil sample <br /> plan presented In Table 4 The selected samples will be analyzed for BTEX, TPHg, MtBE, DIPS, <br /> TAME, EtBE, and TBA using Environmental Protection Agency (EPA) Method 82606 <br /> a <br /> Well Installation and Well Development <br /> Groundwater Monitoring Wells <br /> Each monitoring well will be constructed using 2-Inch diameter PVC blank casing and 0 020-inch-slot <br /> well screen set from 7 feet bgs to 17 feet bgs A sand filter pack will be placed within the annulus of <br /> the well from the bottom of the boring to approximately one foot above the top of the well screen <br /> The annulus of the well will be sealed with two feet of bentonite on top of the sand, and a portland <br /> cement/bentonite grout to the surface An 8-Inch-diameter, traffic-rated, watertight street box will be <br /> Installed to protect the well from surface traffic Each monitoring well will be Installed at the location <br /> depicted on Figure 5 <br /> Following Installation, the new wells will be professionally surveyed to establish horizontal position in <br /> relation to pertinent site features and elevation with respect to mean sea level <br /> Groundwater Extraction Well <br /> Extraction well EX-1 will be constructed using 4-inch diameter PVC casing with the screen set from <br /> 10 to 25 feet bgs In order to improve well efficiency, a 0 010-Inch Circum Slot casing from Boart <br /> Longyear and #2416 sand will be used to complete the well The sand filter pack will be placed <br /> within the annulus of the well from the bottom of the boring to approximately one foot above the top <br /> of the well screen The annulus of the well will be sealed with two feet of bentonite on top of the <br /> sand, and a portland cement/bentonite grout to the surface A 12-inch-diameter, traffic-rated, <br /> watertight street box will be Installed to protect the well from surface traffic The extraction well will <br /> be Installed at the location depicted on Figure 5 <br /> Well Development <br /> Following Installation, the monitoring and extraction wells will be developed by surging and bailing <br /> using a surge block and bailer to remove fine-grained sediments from each well and sand pack <br /> Periodic measurements of pH, conductivity and temperature will be made during development to <br /> establish baseline values for groundwater Approximately 10 well casing volumes will be removed <br /> from each well during development All water generated during the development activities will be <br /> stored In DOT approved 55-gallon drums pending disposal <br /> Oxygen Infection Well <br /> The oxygen infection well (S-1) will be constructed with 3/4-inch diameter schedule 80 PVC blank <br /> casing and a 3-foot long stainless steel sparging diffuser tip The sparge tip will be Installed from 17 <br /> to 20 feet bgs (Table 3) A sand filter pack will be placed within the annulus of the well from the <br /> bottom of the boring to approximately one foot above the top of the diffuser tip The annulus of the <br /> well will be sealed with two feet of bentonite on top of the sand that will be capped with a Portland <br /> cement/bentonite grout to the surface The well will be sealed using a locking expansion cap An 8- <br /> inch-diameter, traffic-rated, watertight street box will be installed to protect the well from surface <br /> traffic <br /> 32262 Offsite well install and interim remediation workplan doc SECOR International Incorporated <br />