My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002170
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
3500 - Local Oversight Program
>
PR0545208
>
ARCHIVED REPORTS_XR0002170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 4:35:45 PM
Creation date
1/27/2020 4:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002170
RECORD_ID
PR0545208
PE
3528
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
02
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mi I"EGG Cone Penetration Testing Procedure <br /> CPT <br /> Gregg In Situ, Inc carries out all Cone Penetration Tests (CPT) using an <br /> integrated electronic cone system, Figure CPT The soundings were conducted <br /> using a 20 ton capacity cone with a tip area of 15 cm2 and a friction sleeve area <br /> of 225 cm2 The cone is designed with an equal end area friction sleeve and a <br /> tip end area ratio of 0 85 <br /> The cone takes measurements of <br /> cone bearing (qj, sleeve friction (fl) Geophones <br /> and dynamic pore water pressure (VS&Vp) C <br /> (u2) at 5-cm intervals during <br /> penetration to provide a nearly Push rod <br /> continuous hydrogeologic log CPT connector <br /> data reduction and interpretation is <br /> performed in real time facilitating on- 5011 seal <br /> site decision making The above Electric cable for <br /> mentioned parameters are stored on signal transmission <br /> disk for further analysis and Water Seal <br /> reference All CPT soundings are <br /> performed in accordance with Friction load cell <br /> revised (2002) ASTM standards (D Frictin sleeve <br /> 5778-95) X inclinometer <br /> The cone also contains a porous Ox�Y� <br /> filter element located directly behind Tip load Cell <br /> the cone tap (u2), Figure CPT It <br /> consists of porous plastic and is <br /> 5 0mm thick The filter element is Water Seal <br /> used to obtain dynamic pore <br /> pressure as the cone is advanced as Soil seal <br /> well as Pore Pressure Dissipation xTore Pre Transducer re <br /> Tests (PPDT's) during appropriate TI load Cell (U2) <br /> pauses in penetration It should be p Filter <br /> noted that prior to penetration, the <br /> element is fully saturated with silicon krne Tip (qc) <br /> oil under vacuum pressure to ensure <br /> accurate and fast dissipation Figure CPT <br /> When the soundings are complete, the test holes are grouted using a Gregg In <br /> l Situ support rig The grouting procedure consists of pushing a hollow CPT rod <br /> with a "knock out" plug to the termination depth of the test hole Grout is then <br /> pumped under pressure as the tremae pipe is pulled from the hole Disruption or <br /> further contamination to the site is therefore minimized <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.