Laserfiche WebLink
Al u M <br /> CHEVRON WELL MONITORING DATA SHEET <br /> Project #jrCe goo- Station # .50-1 <br /> SamplerN/M Start Date: <br /> Well I D. �.r� Well Diameter- (circle one) (�) 3 4 6 <br /> Total Well Depth A?/O Depth to Water. 6 .5-,-,-j,. <br /> Before After Before After <br /> Depth to Free Product. Thickness of Free Product (feet) : <br /> Measurements referenced to- PVC Grade Other: <br /> Well Diameter VOCF04 Well6��Diameter CF <br /> 1" <br /> „ n 2 61 <br /> 4.08 <br /> �, I, <br /> 4 1 02 16" 1084 <br /> 5„ 3 <br /> r X -- <br /> 1 Case Volume Specified Volumes - gallons <br /> Purging Bailer Sampling: Bailer <br /> Disposable Bailer 55 leBa3. er <br /> Extraction Port <br /> ubme r s..b le Other <br /> Extraction Pump <br /> Other <br /> TIME (F) REMOVED. <br /> pH COND TURBIDITY VOLUME OBSERVATIONS. <br /> REMOVED. <br /> /5~ Pb 7. 3; M a <br /> � - 01 .��•� 7� � rte' <br /> Did Well Dewater?^V If yes, gals. Gallons Actually Evacuated <br /> Sampling T=e: l5-. Sampling Date: 6- <br /> Sample 1.D. Laboratory <br /> Analyzed for. - T X TPH-D OTHER <br /> (Circle) <br /> Duplicate I D. : Cleaning Blank I D. : <br /> Analyzed for: TPH-G BTEX TPH--D OTHER: <br /> (Circle) <br />