My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002166
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
5431
>
3500 - Local Oversight Program
>
PR0545212
>
ARCHIVED REPORTS_XR0002166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 4:50:13 PM
Creation date
1/27/2020 4:36:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002166
RECORD_ID
PR0545212
PE
3528
FACILITY_ID
FA0025705
FACILITY_NAME
PETRIG SEED
STREET_NUMBER
5431
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
BANTA
Zip
95304
APN
21317047
CURRENT_STATUS
02
SITE_LOCATION
5431 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5431 Grant Line Road, Banta, California August 2, 1994 <br /> Chevron USA Products Company Page 1 <br /> 1.0 INTRODUCTION <br /> This report is submitted by Groundwater Technology, Inc to summarize the methods and results of <br /> additional environmental assessment work conducted at the former Signal Oil service station #221-5 <br /> located at 5431 Grant Line Road in Banta, California (Figures 1 and 2) Two soil borings were drilled <br /> and sampled to define the extent of hydrocarbon-impacted soil In the vicinity of the former underground <br /> storage tanks (USTs) The two borings were drilled to accommodate installation of groundwater <br /> monitoring wells MW-2 and MW-3 (Figure 2) This report summarizes the results of the drilling, sod <br /> sampling, well construction and well development completed June 21, 1994 The results of groundwater <br /> monitoring and sampling will be summarized in a later report The work completed at the site was <br /> conducted in accordance with Groundwater Technology's Work Plan for Soil and Groundwater <br /> Assessment, dated June 6, 1994 which was accepted by the San Joaquin County Public Health <br /> Services, Environmental Health Division (SJCPHS-EHD) <br /> ❑❑0 GROUNDWATER <br /> 0014EAR RPT(Chv-4kGRANTUN) ❑❑❑ TECHNOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.