Laserfiche WebLink
Soil Excavation Report <br /> ] B Terminal/Blincoe Trucking <br /> 6700 Grantline Road, Tracy, CA <br /> Project No W0322 01 <br /> Page 4 <br /> Backfilling the Excavation <br /> On Friday April 9, 1993 backfilling of the tank pit was initiated using pea gravel to within five <br /> feet of the surface, engineered fill in one foot lifts to 2 feet below grade and road base with <br /> asphalt capping to grade <br /> RECOMMENDATIONS/CONCLUSIONS <br /> Based upon the analytical results of the confirmation samples all contaminated soil was <br /> successfully removed RESNA Industries recommends one year of quarterly monitoring and <br /> sampling of wells MW2, MW3, MW4 and MWS <br /> 3 B Terminal is conducting additional characterization of soil pile SP2 prior to removal or <br /> aeration A disposal/remediation plan for soil pile SP2 will be developed subsequent to the <br /> additional characterization activities <br /> If you have any questions or comments please call me at (209) 838-3507 <br /> • Respectfully, <br /> RESNA Industries, Inc <br /> Lois Frantz U <br /> Project Geologist <br /> Gregory P Stahl <br /> CA Registered Geologist No 5023 <br /> LF/gk <br /> Attachments <br /> PC Nick Kosta <br /> Steve Bond, CA RWQCB <br /> R-32693 FNL <br />