My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002135
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
6700
>
3500 - Local Oversight Program
>
PR0545213
>
ARCHIVED REPORTS_XR0002135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 5:07:33 PM
Creation date
1/27/2020 4:46:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002135
RECORD_ID
PR0545213
PE
3528
FACILITY_ID
FA0005338
FACILITY_NAME
J B TERMINAL CO
STREET_NUMBER
6700
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
6700 GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Well Development Protocol <br /> Groundwater monitoring wells will be developed by removing <br /> approximately 10 times the volume of water in the casing or <br /> until relatively free of sand and silt, if possible. Casing <br /> volumes will be calculated in the following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> Diameter I.D. Volume <br /> (inches) (inches) Gal/linear ft. <br /> 2 2. 067 0.17 <br /> 4 4.026 0.66 <br /> Volume of open Borehole and' Annular Space <br /> Between Casing and Hole <br /> Volume/ Volume/ <br /> Hole linear ft. Nominal linear ft. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> (inches) Gal. Cu. ft. (inches) Gal. Cu. Ft. <br /> -------------------------------------------------------------....- <br /> 7.25 2. 14 0.29 2 1.91 0.26 <br /> 8.25 2.78 0. 37 2 2.55 0.34 <br /> 10.25 4.29 0.57 2 4. 06 0.54 <br /> 10.25 4 .29 0. 57 4 3. 46 0.46 <br /> 12. 25 6. 13 0. 82 4 5.30 0.71 <br /> *Note: Annular volumes will be multiplied by 30% to account for <br /> porosity of filter pack. <br /> If the aquifer is slow to recharge, development will continue <br /> . until recharge is too slow to practically continue. The <br /> volume of water produced versus time will be recorded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.