Laserfiche WebLink
Addendum to Work Plan for Additional Subsurface Investigation February 5, 1992 <br /> J B Terminal, 6700 Granthne Road, Tracy, CA W0322 <br /> Task 4. Project Management and Report Preparation <br /> After completion of the field activities, RESNA will prepare a report summarizing the field <br /> procedures, analytical results, report conclusions, and make recommendations for further <br /> activities. <br /> RESNA will include the two new wells in the on-going quarterly monitoring program at the site. <br /> Depth to water measurements and groundwater samples will be collected and analyzed on a <br /> quarterly basis Field methods and procedures, groundwater data, and finding will be <br /> summarized in Quarterly Reports written in accordance with CRWQCB guidelines. <br /> RESNA will proceed with the proposed field work upon approval of this addendum from the <br /> SJCPHS If you have any questions regarding this letter or the project, please call Nora Kataoka <br /> at (209) 838-3507 <br /> Respectfully, <br /> RESNA Industries <br /> I&Itku a. ��� I <br /> Sharon A Young <br /> Microbiologist <br /> K'n'_. U �z <br /> Nora H. Kataoka <br /> CA Registered Civil Engineer No. 38322 <br /> ATTACHMENTS <br /> Figure 1 Site Location Map <br /> Figure 2 Proposed Monitoring Well Locations <br /> Figure 3 Typical Well Construction <br /> Attachment 1 Quality Assurance/Quality Control Plan <br /> Attachment 2 Health and Safety Plan <br /> Attachment 3 Application for Permit/Fihng Fee <br /> cc Nick Kosta, J B Terminal <br /> Jim Maughan, CRWQCB <br /> WPM0392 SAY 3 <br />