Laserfiche WebLink
WaterWork Corporation <br /> t+uality Assurance and Quality Control Plan <br /> The Remedial Investigation (RI ) Quality Assurance/Quality Control <br /> ( QA/QC) program is intended to facilitate the acquisition of <br /> accurate and reliable data. Environmental data gathered during <br /> the RI will be collected and analyzed following procedures <br /> prescribed in the Quality Control Program. A Quality Assurance <br /> Program has been established to assure that the Quality Control <br /> Program is effective. Both programs are necessary to provide <br /> accurate data and documentation for investigations and laboratory <br /> analyses. The following field and laboratory procedures will be <br /> implemented to ensure that QA/QC objectives are met <br /> 1 .0 Recordirg of Field Data <br /> All information pertinent to the field investigation will be <br /> kept in a fielc log book. Information to be documented <br /> includes at least the following: <br /> - Sample numbers <br /> - Locations of sample collection <br /> - Soil boring or well numbers, as applicable <br /> - Depths at which samples were obtained <br /> - lames of collectors <br /> - )ates and times of collection <br /> - Purpose of sample <br /> - Sanple distribution (e.g. , laboratory, 3rchrve etc. ) <br /> - Field observations <br /> - Field measurements (e.g. , PID readings, P„', <br /> conductivity, water levels ) , <br /> - Other data records (e g. development log, soil sampling <br /> report, well log, Ftc. ) <br /> 2. 0 CamDle Containers <br /> Groundwater samples will be placed in containers suppled by <br /> the analytical laboratory. Table 1 summarizes the required <br /> samlle containers. <br />