My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002145
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
6700
>
3500 - Local Oversight Program
>
PR0545213
>
ARCHIVED REPORTS_XR0002145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 5:08:01 PM
Creation date
1/27/2020 4:50:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002145
RECORD_ID
PR0545213
PE
3528
FACILITY_ID
FA0005338
FACILITY_NAME
J B TERMINAL CO
STREET_NUMBER
6700
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
6700 GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product thickness is calculated by subtracting the depth to <br /> • product prom the depth to water In addition, water <br /> elevation, are adjusted for the presence of fuel with the <br /> following calculation. <br /> (Product Thickness ) ( . $ )+(Water Elevation) <br /> = Corrected V'-:ter Elevation <br /> Note- The factor of 0. 8 accounts for the density difference <br /> between water and petroleum hydrocarbons. <br /> New-Ly installed wells will be allowed to stabilize for 24 <br /> hours after development prior to free product inspection. <br /> a <br /> An acrylic Surface Sampler will be used for visual <br /> inspection of the groundwater in order -co note sheens <br /> ( difficult to detect with the Interface Probe ) , odors , <br /> microbial action and sediments. The sampler is calibrated <br /> in inches and centimeters fog visual inspection of product <br /> thickness. <br /> To reduce the potential for cross contamination between <br /> wells, the monitorings will take place in order from the <br /> least to most contaminated, if known. Wells containing free <br /> product will be monitored last. Between each well <br /> monitoring the equipment will be decontaminated. <br /> • Water level data collected from rhe wells will be used to <br /> develop a groundwater contour map for the project site. <br /> Groundwater flow will be estimated to be perpendicular to <br /> equipotential lines drawn on the map. <br /> 10.0 Well Development Protocol <br /> Groundwater monitoring wells will be surged and developed <br /> prior to setting the surface seal. Approximately 10 times <br /> the volume of water in the casing will be withdrawn if <br /> possible. Casing volumes will be calculated in the <br /> following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> Diameter I.D. Volume <br /> ( inches ) ( inches) Gal/linear ft. <br /> ------------------------------------------ <br /> 2 2 067 0. 17 <br /> 4 x: .026 0. 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.