My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002147
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
6700
>
3500 - Local Oversight Program
>
PR0545213
>
ARCHIVED REPORTS_XR0002147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 5:09:35 PM
Creation date
1/27/2020 4:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002147
RECORD_ID
PR0545213
PE
3528
FACILITY_ID
FA0005338
FACILITY_NAME
J B TERMINAL CO
STREET_NUMBER
6700
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
6700 GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• will be decontaminated prior to commencing drilling at each <br /> hole . Well construction materials will be cleaned as <br /> necessary, prior to installation. <br /> Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontamination <br /> effluent will be contained. All surfaces of the equipment <br /> gill, be thoroughly decontaminated using a steam cleaner. <br /> The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will stored in containers <br /> certified for hazardous materials storage and disposed of in <br /> an approved manner. <br /> Sample equipment to be used for pesticides and organic <br /> analysis will be cashed in a nonphosphate detergent (Alconox <br /> or equivalent ) and rinsed with tap water, followed by <br /> deionized water and finally with acetone. if the equipment <br /> is for metals analysis, the initial rinse will be conducted <br /> with 0. 1 N nitric acid followed by tap water and demonized <br /> water. <br /> 7.0 Field Equipment Calibration and Maintenance <br /> f+ <br /> The following measuring equipme-it may be used during the <br /> Remedial Investigation. Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed <br /> for each piece. <br /> 0 Soil Borings and Well Dimensions-Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in Wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied temperature correction <br /> will be applied as applicable for field conditions . <br /> Electrical well sounders. Calibration: check against steel <br /> surveyor' s tape. <br /> Organic Vapors- Photoionization detector. Calibration: <br /> Daily field Calibration using a isobutylene standard as per <br /> manufacturers instructions. <br /> Groundwater pH Measurement- Digital pH meter. Calibration: <br /> standard pH solutions of 4, 7, and 10 will be utilized for <br /> dally field calibration according to manufacturers <br /> instructions. <br /> Electrical Conductivity- Electrical conductivity meter. <br /> Calibration: factory-calibrated annually and periodically <br /> calibrated against laboratory prepared standard calibration <br /> solution. <br /> Water Tem2erature- Mercury or digital thermometers <br /> Cali ation: factory-calibrated once. <br />
The URL can be used to link to this page
Your browser does not support the video tag.