Laserfiche WebLink
Monitoring well MW-3 <br /> Steel Cap <br /> ' ` Padlock <br /> db P V C locking Cap <br /> b <br /> d A <br /> 6 <br /> e <br /> "A V <br /> D0 2" I 0. Schedule 40 <br /> P.V.0 Pipe <br /> el <br /> 4 b <br /> d a Concrete Grout Seal <br /> D v <br /> P <br /> I A a DP <br /> O <br /> Bentonite Pillet Seal <br /> CN Groundwater Deptn <br /> (See Goring Log) <br /> I _ - <br /> 1 <br /> o _ <br /> Casing Slots ( 020 lncnes Aide) <br /> i <br /> r' Washed Kiln Dried Sand (,qo 4) <br /> r <br /> f! <br /> Threaded P. V C Shoe <br /> NOT TO SCALE <br /> Tn1s monitoring well was installed under the <br /> supervision <br /> Certified Engineer <br />' <br /> 22 ADVANCE SOIL TECHNOLOGY, INC <br />