My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTO PLAZA
>
3500
>
2200 - Hazardous Waste Program
>
PR0514484
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 10:45:55 AM
Creation date
1/29/2020 10:15:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514484
PE
2228
FACILITY_ID
FA0010988
FACILITY_NAME
TRACY FORD
STREET_NUMBER
3500
STREET_NAME
AUTO PLAZA
STREET_TYPE
WAY
City
TRACY
Zip
95304
CURRENT_STATUS
01
SITE_LOCATION
3500 AUTO PLAZA WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Compliance Coro � VED <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 96A- <br /> Email: s cco La�hotmail.com <br /> Website: www.speplan.com DEC 0 3 2018 <br /> Certified Assessment Form (PE) for AST Svstems <br /> Assessor: Spill Prevention Compliance Corporation Onsite Assessor: 11>MMMT W IAL I IV'AI- fl, <br /> P.O. Box 1289 Telephone: (209) 549-24ML;PARfNIEN-I' <br /> Waterford, CA 95386 Email: spceorp(d,hotmail.com <br /> ----------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> Client: — Tracy Ford New Cars Contact: Wavne Maciel, Service Manager <br /> Address: 3500 Auto Plaza Way Phone No.: 209-835-4821 <br /> City/State/Zip: Tracy, CA 95304 Date of Test: 8-23-18 <br /> ----------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> Assessment Data- Waste Oil AST -a <br /> 1. AST Configuration &age of AST Horizontal AST Double wall steel/approx. 11 vrs. Old ( 12/2007) <br /> Ia. Useful Life Remaining of AST Approximately 35 years of remaining life (Subsection k1-k10) <br /> 2. AST Primary vessel construction (describe) 491 gals./Waste Oil/UL# L-244451 /UL142-Container/Made to <br /> UL 142 construction standard-at least 0.093 in.steel thickness per UL Std for Safetv for Steel Aboveground <br /> Tanks for Flammable and Combustible Liquids,suitable for containing waste oil <br /> 3. AST piping(describe) 1 in. galvanized pipe from Graco Husky 1040 pneumatic pump to 2 in opening <br /> w/fitting,from pump for supply to top of AST. There is an inline check valve between supplv hose & pump <br /> Piping is adequately secured supported & protected against physical damage and excessive stress due to <br /> settlement,vibration, expansion or contraction & was tested found to be in good condition & not leaking <br /> 4. Internal/External pump description External wall mounted Graco Husky 1040 pump w/2 solenoid 12volt-10- <br /> 200psi-w/continuous electronic monitoring& BJ Enterprises tank BJ Ent TM1 solenoid auto shut down- <br /> External pump,which pumps waste oil from waste oil caddies from service area Ancillary equipment is <br /> secured to wall,&supported and protected against phvsical damage and excessive stress due to settlement <br /> vibration,expansion or contraction (see pie) <br /> 5. AST drawing(provided/drawn: source) (see attached) <br /> 6. Design Standard (ASME, UL,etc.) UL 142 - Double Wall Steel/Mfr.: Containment Solutions <br /> 7. AST foundation (describe) Concrete sub-floor,Base of AST under UL 142 adequate to withstand the load of <br /> a full tank-Tank is anchored to floor. <br /> 8. AST anclioring(seismic zone/floatation risk)AST is anchored,with steel flanges welded to outer shell of tank, <br /> with clam shell anchors & '/2 in. anchor bolts into the concrete floor. Tracy is a (ground-shaking)seismic <br /> region, AST is situated in secured locked lubricants room at rear of main Service building The tanks are <br /> unlikely to move outside the room in a seismic event or a flooding event <br /> 9. AST will withstand frost-heave XX Yes No AST is located in secured lubricants room not subject <br /> to weather conditions <br /> 10. AST previously relocated? Yes XX No <br /> 11. AST Corrosion Protection Tank is covered in paint,with no evidence of external corrosion Tank has <br /> no specific corrosion protection beyond the paint No part of the AST touches the ground The base of the <br /> AST is steel, raised 2 inches from the concrete pad There is no evidence of internal corrosion taking place <br /> Tank's construction material is carbon steel. <br /> 12.AST Spill Prevention Equipment Product is remote filled via connecting waste oil caddies to pumps via a <br />
The URL can be used to link to this page
Your browser does not support the video tag.