My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
434
>
2900 - Site Mitigation Program
>
PR0542174
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:54:52 PM
Creation date
1/29/2020 10:41:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542174
PE
2950
FACILITY_ID
FA0024221
FACILITY_NAME
PAYLESS SHOES SOURCE
STREET_NUMBER
434
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16715031
CURRENT_STATUS
01
SITE_LOCATION
434 DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lor Xiong [EH] <br /> From: Maroon, Nathan <NMaroon@partneresi.com> <br /> Sent: Thursday, October 5, 2017 12:53 PM <br /> To: Lor Xiong [EH] <br /> Subject: RE: Updated Soil Gas Sampling Methodology 434 Dr. MLK Jr. Blvd <br /> Attachments: Updated Soil Gas Sampling Methodology.docx <br /> Whoops. Missed that. Here is the edit. <br /> Nate Maroon <br /> Staff Scientist—Subsurface Investigation <br /> PARTNER ENGINEERING AND SCIENCE,INC. <br /> 1017 22"0 Avenue, Suite 107, Oakland, CA 94606 <br /> Cell: 510-410-1009 1 Direct: 510-431-6262 <br /> From: Lor Xiong [EH] [mailto:lxiong@sjcehd.com] <br /> Sent:Thursday, October 05, 2017 12:50 PM <br /> To: Maroon, Nathan <NMaroon@partneresi.com> <br /> Cc: Michael Kith [EH] <mkith @sjcehd.com> <br /> Subject: RE: Updated Soil Gas Sampling Methodology 434 Dr. MLK Jr. Blvd <br /> Hi Nate, <br /> Per our conversation, we required the use of grout cement for back filling. Your plan still states that boreholes will be <br /> backfilled with dry,granular bentonite to approximately six inches below the desired sampling depth. <br /> Boreholes must be backfill with grout cement to approximately six inches below the desired sampling depth. After <br /> sampling, all content from the construction of the soil vapor probes must be removed and be grouted with grout cement <br /> from sampling depth to the ground surface. <br /> Lor Xiong,REHS <br /> San Joaquin County Environmental Health Department <br /> 1868 E.Hazelton Ave. <br /> Stockton,CA 95205 <br /> Ixiong@sicehd.com <br /> (209)468-2807 <br /> From: Maroon, Nathan [mailto:NMaroon@partneresi.com] <br /> Sent:Thursday, October 5, 2017 12:25 PM <br /> To: Lor Xiong [EH] <Ixiong@sicehd.com> <br /> Subject: Updated Soil Gas Sampling Methodology 434 Dr. MLK Jr. Blvd <br /> See attached. <br /> Nate Maroon <br /> Staff Scientist—Subsurface Investigation <br /> PARTNER ENGINEERING AND SCIENCE,INC. <br /> 1017 22"d Avenue, Suite 107, Oakland, CA 94606 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.