Laserfiche WebLink
{ r <br /> Fust Nationwide Bank ,. West lane Plaza <br /> i <br /> if desired, by implementing a more rigorous soil <br /> sampling program or by installation and sampling of <br /> i <br /> monitoring wells to establish a baseline of ground <br /> water quality. <br /> j This report was prepared :for the use of First <br /> Nationwide Bank in evaluating soil quality at the <br /> referenced site at the time of, this study. We make <br /> no warranty, expressed or implied, except that our <br /> services have been performed in accordance with <br /> environmental engineering-,. principles generally <br /> accepted at this time and location. The chemical <br /> and other data presented in this report can change <br /> r <br /> over time and are applicable only to the time this <br /> study was performed. <br /> i <br /> i <br /> i� <br /> 'i <br /> LDUNEVASSOCIATES Page s <br /> Envfronmental/Georechnical/Engineering Services n <br /> 1 b <br />