My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:55:58 AM
Creation date
1/29/2020 11:31:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�_�_Ar <br /> _ <br /> _ <br /> Working to Restore Nature <br /> _.t.r SE 24 <br /> 3164 Gold Camp Drive, Suite 200 <br /> Rancho Cordova, CA 95670 <br /> Phone: (916) 852-6690 <br /> Fax: (916)852-6688 September 23, 1993 <br /> Mr. Scott Hooton <br /> BP-Oil Company ` <br /> North Western Division <br /> 16400 South Center Parkway, Suite 301 <br /> Tukwila, Washington 98188 <br /> Subject: Addendum to Work Plan 'for..Subsurface Investigation at BP Facility No. <br /> 11191, 1469 East Hammer Larne, Stockton, California. <br /> Mr. Hooton: <br /> At the request of BP Oil Company (BP),` RESNA Industries (RESNA) is submitting an <br /> addendum to our previous workplan(RESNA, October 13, 1992,Work Plan No. 17050.01). <br /> Additional work includes drilling one soil boring to approximately 50 feet below grade. The <br /> location of the project site is shown on the Site Vicinity Map (Plate 1). "The location of the <br /> proposed soil'boring is shown on the Generalized Site Plan (Plate 2). <br /> During December 1992, four soil borings were drilled at the site. Groundwater was not <br /> encountered in the soil borings. Gasoline hydrocarbons were detected in soil samples <br /> collected from boring B-4, near.the southern region of the northwestern dispenser island. <br /> Benzene concentrations ranged from 0.025 to 0.088 parts per million. TPHg concentrations <br /> were below laboratory detection limits. <br /> The proposed additional soil boring is to delineate residual hydrocarbons detected soil <br /> boring B-4. RESNA will conduct the following tasks: <br /> o Contact Underground Service Alert at least 48 hours before drilling to delineate <br /> public utility lines. <br /> o Observe drilling of one 8�inch-diameter soil boring to approximately 50 feet below <br /> surface grade, or until first.detected groundwater. The soil boring will be located <br /> near boring B-4. Drilling will be performed by a licensed well driller. <br /> o Collect relatively undisturbed soil samples at 5400t intervals from the boring,identify <br /> the samples using manual and visual methods, and classify the samples according to <br /> the Unified Soil Classification System. <br /> 123013-iw <br />
The URL can be used to link to this page
Your browser does not support the video tag.