My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:55:37 AM
Creation date
1/29/2020 11:33:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.. _ <br /> PACIFIC <br /> ENVIRONMENTAL <br /> GROUP INC. <br /> December 22, 1997 <br /> Project 911-008.1 A <br /> Mr. Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue <br /> Stockton, California 95202 <br /> Re: Work Plan for Underground Storage Tank Replacement <br /> Service Station #5447 <br /> 1469 E. Hammer Lane <br /> Stockton, California <br /> Dear Mr. Knoll: <br /> On behalf of Tosco Marketing Company (Tosco), Pacific Environmental Group Inc. - <br /> (PACIFIC) will be performing environmental, services associated with underground <br /> storage tank (UST) replacement activities at the above referenced site (Figures 1 and 2). <br /> A Tosco-approved contractor.will be responsible for all construction activities associated <br /> with the station demobilization, including UST and product line permitting, removal, and <br /> disposal. Activities are tentatively scheduled to begin in January 1998. The purpose of " <br /> this Work Plan is to notify the San Joaquin County Environmental Health Department <br /> (SJCEHD) of the upcoming UST replacement activities and briefly discuss the sampling <br /> procedures to be followed during UST and product Iine replacement activities. <br /> SITE BACKGROUND <br /> The site is located at the intersection of E. Hammer Lane and West Lane in Stockton, <br /> California. The site is an operating service station and mini-mart that retails gasoline and <br /> diesel fuel. The site currently contains three gasoline USTs of 10,000 gallon capacity, <br /> one diesel UST of 10,000 gallon capacity, and associated product lines and dispensers. <br /> PROPOSED SCOPE OF WORK <br /> Four USTs and associated product lines are scheduled to be removed by a Tosco <br /> approved contractor during January 1998. Upon removal, each tank and associated <br /> product lines will be transported by an approved contractor for disposal or recycling. <br /> Soil and groundwater (if necessary) compliance samples will be collected from below the <br /> 2025 Gateway Place, Suite 440, San Jose,California 95110 (408) 441-7500 FAX (408) 441-7539 <br />
The URL can be used to link to this page
Your browser does not support the video tag.