Laserfiche WebLink
^ December 22, 1997: <br /> Page 4 <br /> Reporting and Schedule <br /> PACIFIC anticipates initiating field activities'during January 1998. •After completion of <br /> the field work and laboratoryanalyses, the-data will be evaluated and assembled into a: <br /> report. Included in the report will be soil analytical results, chain-of-custody` <br /> documentation, a summary of field observations, assessment, and.conclusions. This <br /> report will be submitted to the SJCEHD within 6 t6"8 weeks'of receiving analytical. <br /> sample results from the laboratory. <br /> If there are any questions.regarding the contents of this work+plan, please call us at (916) <br /> 858-2350. <br /> Sincerely,, <br /> Pacific Environmental Group, Inca <br /> Rusty E. Benkosky, - <br /> Project Engineer S��R o�o�/' <br /> JOSEPH J. Mull10 <br /> No. 1672 <br /> CE1t7'IEIED <br /> Joseph Muzzi E#�6t�lE1 R[1td <br /> Project Geologist �� GEOLt3615T P <br /> CEG 1672 4rF OF uuw°P�� <br /> Attachments' Fijure I - Site Location Map <br /> Figure 2 --Site Map <br /> Attachment A - Field and Laboratory Procedures <br /> Attachment B -Site Health.and,Safety Plan <br /> cc: Mr. Ed.Ralston,.Tosco Marketing Company <br /> Ms. Elizabeth Thayer,'RWQCB - Central Valley Region <br /> Mr. Robert McClellon, San Joaquin County-- <br /> 911-0 0 8.1 A/WORKPI <br /> ounty-911-008.1A/WORKPI NNI <br />