My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 11:55:37 AM
Creation date
1/29/2020 11:33:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety-Plan-October 14, 1992 <br /> BP Oil Facility No.11191,'Stockton, CA Working 7o Restore Nature <br /> HAZARD ASSESSMENT <br /> The major contaminants expected to be encountered on the project are gasoline and its hydrocarbon <br /> constituents..The anticipated contaminants and their exposure-standards are.listed in'Table 1. It is <br /> not anticipated that the.potential levels of exposure will reach the permissible exposure limits(PEL). <br /> -or threshold limit values,(TLV). Inhalation and dermal contact are the potential exposure <br /> pathways. -Protective clothing wi11`be mandatory for field personnel specified in this Plan. In <br /> addition, respiratory-protecpve devices are required to be.worn by each person onsite or.to be <br /> Within easy,reach should irritating odors be detected or irritation of the respiratory tract occur. <br /> TABLE 1 <br /> EXPOSURE LIMITS OF ANTICIPATED CHEMICAL CONTAMINANTS <br /> BP Oil Facility No. 11191 <br /> Hammer Lane&West Lane <br /> Stockton,California <br /> (page 1 of 2) <br /> Contaminant PEL EL ED CL TWA STEL <br /> F Benzenel [skin] 1* 10* 5* <br /> (carc) <br /> Ethylbenzene - 100* <br /> f 100* 125* <br /> Gasoline2 300* 300* 500* <br /> Toluene [skinl 100* 200* 10 min per 500* 100* 150* <br /> 8 hrs <br /> i <br /> Xylene (o,m, ,100* 200*: 30 min per 300* 100* 150* <br /> & p isomers) 8 hrs <br /> '[skin] <br /> See notes on page 2 of 2. <br /> I <br /> I <br />! I7050.olssP 3 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.