My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0001999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0001999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:35:08 PM
Creation date
1/29/2020 11:38:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001999
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS <br /> Mr Harlin Knoll Page 6 <br /> San Joaquin County Environmental Health Department <br /> May 19, 2003 <br /> Sensitive Receptors <br /> The nearest municipal supply well (CSDMU well 3-2) is located approximately 2,000 feet south of the <br /> site and is sealed to a depth of 144 feet bgs Well 3-2 is screened from 144 go 376 feet bgs and from <br /> 386 to 625 feet bgs <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Fuel related petroleum hydrocarbons were not detected in groundwater at the two new off-site <br /> monitoring wells (MW-6 and MW-7) The groundwater sample from deep on-site well MW-5 contained <br /> concentrations of TPHg and MtBE that were lower than those reported in shallow on-site monitoring <br /> wells The lithology encountered below the screen interval of MW-5 (from 70 to 98 feet bgs) consisted <br /> of clay and silt <br /> URS recommends additional quarterly monitoring to assess if the vertical and lateral extent of impacted <br /> groundwater has been defined <br /> . If you have any questions or comments regarding this letter, please call Mr Vernon Elarth at (916)679- <br /> 2299 <br /> Sincerely, <br /> D GFS <br /> URS Corporation Americas <br /> �-\`, o IPABOG, <br /> No 7 20 s <br /> Exp i 3/ O <br /> Scott Lookin ill Vernon Elarth, R G <br /> Project Geologist Project Manager 9 OF GAUF <br /> Attachments Table 1 Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map <br /> Figure 3 Geologic Cross Section A.'-A. <br /> Figure 4 Geologic Cross Section B'-B <br /> Figure 5 Groundwater Elevation Contours <br /> Figure 6 Groundwater Analytical Summary <br /> K 1Wprocessll5 BP ARC011 WQ\Well Installationlwell installation report03 dm <br />
The URL can be used to link to this page
Your browser does not support the video tag.