Laserfiche WebLink
Fs <br /> ARCO / BP WELL MONITORING DATA SHEET <br /> t <br /> SCos o14 t0 - a-M- i. Station # Mi> t1tql <br /> pler• r-ti. , �e C.,��„��.� Date Lt tto`a 3 <br /> Well I D - �Ik — ? Well Diameter D 3 4 6 8 <br /> Total Well Depth �c�. oti ::� <br /> Depth to Water* L4G.3 0 <br /> T7epth to Free Product. ThicImess of Free Product (feet)- <br /> '—ferenced to- PVC Grade D O. Metes (if req'd) YSI HACH <br /> 7amp3" <br /> L01 QlArneter0 04 `4" 065 <br /> 016 6" 147 <br /> 037 Other radium*0 163 <br /> Purge Method Boiler Sampling Method Bader <br /> Dtsposabie Bailer is :sable Bailer <br /> Middiebur Extraction Pait <br /> Electric,Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirni that water level 1s below the tap <br /> of screen Otherwise, the well must be purged <br /> F <br /> x <br /> Gals <br /> _), i Case VoIume(Gals) Specified Volumes Calculated V:lunie <br /> Conduchv* <br /> Time Temp (°F) il <br /> H (MS orLa— Gals Removed Observations <br /> ra cl G7-Co al )(4co 2. s <br /> tb5L( 6 $.Z <br /> SP�s Mlj LA Ot - <br /> Se. (ala <br /> ild well dewater? Yes 1 T Gallons actually evacuated <br /> r^ <br /> �_nnpling Time. 1100 Sampling Date- <br /> 2, «l03 <br /> :inple I D yt%t-j- Laboratory Pace equo4 Other <br /> elyzed for TPH-D Other <br /> O (if req'd): Pre-Purge Ms/1. Post-purge n'g/L <br /> R P. (if req'd) Pre-purge E my Post-purge mV <br /> laine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573,0555 <br />