My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:35:40 PM
Creation date
1/29/2020 11:38:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002000
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PACIFIC <br /> ENVIRONMENTAL <br /> GROUP, INC <br /> AN COMPAW <br /> May I 1998 <br />' Project 31I-174 1A <br /> Mr David Camille <br />' Tosco Marketing Company <br /> 2000 Crow Canyon Place, Suite 400 <br /> San Ramon, California 94583 <br />' Re Soil in Sam l <br /> Sampling Results for Station Upgrade <br />' Tosco Service Station 05447 <br /> 1469 East Hammer Lane at West Lane <br /> Stockton, California <br /> Dear Mr Camille <br /> On behalf of Tosco Marketing Company (Tosco), Pacific Environmental Group, Inc <br /> (PEG) has prepared this letter to document the results of a soil investigation following <br /> the underground storage tank (UST), and product dispenser and piping upgrades at the <br /> site referenced above This investigation was performed by PEG at Tosco's request <br /> SITE DESCRIPTION <br /> The site is located at 1469 East Hammer Lane in Stockton, California (Figure I) The <br /> site is an operating service station and mini-mart that retails gasoline and diesel fuels <br />' The site currently contains two gasoline USTs of 10,000-gallon capacity, one gasoline <br /> UST of 12,000-gallon capacity, one diesel UST of I0,000-gallon capacity, and associ-,/ _ , <br /> ated product lines and dispensers (Figure 2) 1T� <br /> SUMMARY OF WORK PERFORMED <br />' Station upgrades were performed by Balch Construction of Milpitas, California <br /> Upgrades included replacing USTs, product dispensers, and associated piping PEG <br /> collected soil confirmation samples from each area Samples were also collected from <br /> soil stockpiles for disposal profiling and/or potential reuse <br /> All samples were retained m brass Imers, labeled, and capped with Teflon® sheets and <br /> plastic endcaps The samples were then sealed in zip-lock bags and placed on ice The <br /> r <br /> 2025 Gateway Place, Suite 440 • San Jose, California 95110-1014 (408) 441-7500 FAX (408) 441-7539 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.