Laserfiche WebLink
December 22, 1997 <br /> �5 PaLe 4 <br /> Reporting and Schedule <br /> PACIFIC anticipates initiating field activities during January 1998 After completion of <br /> the field work and laboratory analyses, the data will be evaluated and assembled into a <br /> report Included in the report will be soil analytical results, chain-of-custody <br /> documentation, a summary of field observations, assessment, and conclusions This <br /> report will be submitted to the SJCEHD within 6 to 8 weeks of receiving analytical <br /> sample results from the laboratory , <br /> If there are any questions regarding the contents of this work plan, please call us at (916) <br /> 858-2350 <br /> Sincerely, <br /> Pacific Environmental Group, Inc. <br /> 9Ai3� <br /> Rusty E Benkosky <br /> Project Engineer ��tR cp <br /> JOSEPP, J TIUZZIO <br /> S No U72 <br /> CERTiFiED <br /> JosephMuzz] EriniEEKI�G <br /> Project Geologist �� GEOLGo^JST <br /> CEG 1672 4rF OF <br /> attachments Figure 1 - Site Location Map <br /> Figure 2 - Site Map <br /> Attachment A - Field and Laboratory Procedures <br /> Attachment B - Site Health and Safety Plan <br /> cc Mr Ed Ralston, Tosco Marketing Company <br /> Ms Elizabeth Thayer, RWQCB - Central Valley Region <br /> Mr Robert McClellon, San Joaquin County <br /> 911-OUR 1 A.IXVORi.PL \' <br />