My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:29:39 PM
Creation date
1/29/2020 11:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002004
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan, BP Facility No 11 191 <br /> November 10, 1994 <br /> Drill Cuttings and Waste Water Drill cuttings will be placed on and <br /> covered with plastic sheeting and stored at the site pending <br /> disposal GSI will collect stockpile samples and submit for <br /> compositing and disposal analysis as described in Task 3 Waste <br /> water from the decontamination procedures will be stored in drums <br /> at the site pending disposal Following receipt of stockpile <br /> laboratory results BP will be notified to implement proper disposal <br /> of the soil cuttings and water <br /> TASK 3 Chemical Analyses Soil samples from the exploratory soil borings <br /> that are selected for analysis will be submitted to the Pace Inc. <br /> laboratory (California Department of Health Service ELAP #1282) <br /> located in Novato, California Samples will be analyzed for Total <br /> Petroleum Hydrocarbons as Gasoline (TPH-Gasoline) by <br /> Environmental Protection Agency (EPA) Method 8015 (modified), <br /> and for benzene, toluene, ethylbenzene, and xylenes (BTEX) by EPA <br /> Method 8020 The stockpile sample will be analyzed for TPH- <br /> Gasoline, BTEX, and for total lead by either EPA Method 6010 <br /> (ICAP) or 7420 (AA) <br /> TASK 4 Report Preparation_ Upon receipt of all the data, GSI will prepare a <br /> report which describes the drilling activities and presents our <br /> assessment of the extent of residual petroleum hydrocarbon in the <br /> vicinity of borings B-4 and B-5 The report will include copies of the <br /> exploratory soil boring logs, analytical laboratory reports, and <br /> sample chain-of-custody documentation The report will be <br /> submitted to BP for their use and distribution <br /> A copy of this workplan should be forwarded to <br /> Mr Michael Collins <br /> SJEHD <br /> P 0 Box 2009, <br /> Stockton, California 95201 <br /> Report No 4300 701 1 4 <br /> GeoStrategies Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.