Laserfiche WebLink
--------------------- <br /> EXPLANATION <br /> APPROXIMATE Soil boring <br /> PROPERTY LINE <br /> TRASH Proposed soil boring <br /> 0 <br /> i <br /> Q <br /> UST <br /> I _J <br /> B-4� -Sto <br /> p B-2 i r- <br /> 30 <br /> �CZ) <br /> B-S� <br /> Q� • <br /> —N— <br /> I <br /> HAMMER LANE o 50 <br /> Base Map RESNA Generalized Site Plan <br /> Plate 2, dated 12/92 Scale in Feet <br /> SITE PLAN FIGURE <br /> GeoStrategies Inc. BP Oil Facility No 11191 <br /> 1469 East Hammer Lane 2 <br /> Stockton, California <br /> JOB NUMBER REVIEWED BY DATE REVISED DATE <br /> 4300701-1 9/94 11 /94 <br />