Laserfiche WebLink
19111111111, <br /> U <br /> � a GRAPHIC LOG DESCRIPTION <br /> 0 Asphalt <br /> W i i i i i i i <br /> Grout-----—U. <br /> .. W <br /> W.L ♦ F W W <br /> • i <br /> 2 .. W <br /> W • rA i i i i r <br /> w L .w • iwrSw <br /> W i i W i W <br /> W i i i i W i i <br /> W i W <br /> W i i W i i <br /> 4 W i w i s► r F ► <br /> I 8 0.5 Sandy SILT/Silty SAND(ML/SM),fine-grained sand, <br /> ¢ W i <br /> dark gray with staining,dry,medium dense <br /> 10 i i <br /> I 6 20f <br /> SAS <br /> r � tri <br /> i W W W W W W W <br /> i — — — — — — — — —i — — — — — — — — r — — — — <br /> 8 W W i W i W W <br /> L L L L L C L L <br /> y==L L LL L <br /> i LLLL:L~LL <br /> L 2 Z_Z L s-__ <br /> L L L <br /> 10 8 03 "L r=s1s rs rL1L:rs:1 Silty SAND/Sandy SILT(SM/NIL),fine-grained,olive- <br /> -, brown with orange mottling,dry to damp,medium dense <br /> 12L <br /> 2004 LLL L L LLL.. <br /> p <br /> L L L L L L L L <br /> 12 <br /> I Filiiiliiilil <br /> Inch nadass 0 2 4 S <br /> continues <br /> Logged by Zoe Aguiar <br /> Project Mgr Justin Power <br /> Dates Drilled 12/2/92 <br /> I EXPLANATION Drilling Company Kvdhau <br /> Q RecaNered drill sampl° est K «tad ponduchdityl CONTACTS Drilling Method y T'Hollow Stem Auger <br /> roulK canducen Sold when cerlam <br /> ■ Sample sw6d For chemical analysis I K-pnmary 2K-secondary Driller Mike,Joel <br /> ® 54eve sample NR No recovery Dotted where apprwumata <br /> ® C-6 saTple Z Water level dunng drilling - - - Dashed when uncertain Well Head Completion none <br /> CorSZ Water lave[in coapleled Well %///// Hachured whir°grodohonal Type of Sampler 3"grass tubes <br /> ® °�^wla TD(Total Depth) 46 5 Feet <br /> —__-- LOG OF BORING: B-3 BORING <br /> BP Oil Facility No 11191 <br /> 1469 East Hammer Lane B 3 <br /> I Stockton, California <br /> PROJECT NO 17050 01 12192 <br />