My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:33:30 PM
Creation date
1/29/2020 11:44:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002007
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rL Z C OR <br /> 1 <br /> DATE April 28, 2006 <br /> Atlantic Richfield Company, a BP affiliated company <br /> QUARTERLY REPORT <br /> i <br /> Station Number 11191 <br /> i <br /> Site Address 1469 East Hammer Lane, Stockton, CA 95210 <br /> k <br /> Consulting Company SECOR International, Inc — Ms Catherine Spelis <br /> SECOR Project No 77BP 5019100 0436 and 77CP 60191 01 0002 <br /> Primary Agency/Contact San Joaquin County Environmental Health Department (SJC- <br /> EHD)1 Mr Harlin Knoll <br /> WORK PERFORMED THIS QUARTER [First—20061 <br /> 1 Performed the first quarter 2006 groundwater monitoring event on January 17, 2006 <br /> WORK PROPOSED FOR NEXT QUARTER [Second —2006] <br /> 1 Groundwater monitoring and sampling event will be performed by SECOR <br /> 2 Prepare and submit the first quarter 2006 quarterly groundwater monitoring report <br /> DISCUSSION <br /> The site is an operating service station located on the northwest corner of the intersection of <br /> Hammer Lane and West Lane in Stockton, California (Figure 1) Site features include a station <br /> building, a separate building containing restrooms, and three dispenser islands with a concrete <br /> drive slab and canopy (Figure 2) Existing underground storage tanks (UST)s at the station <br /> • include one 12,000-gallon, one 10,000-gallon, and two 6,000-gallon single wall fiberglass tanks <br /> all installed in 1984 According to the station manager, the USTs contain regular unleaded, <br /> super unleaded, and plus unleaded gasoline and diesel The tanks are equipped with a leak <br /> detection system, and the contents are periodically measured with a stick <br /> Beyond Petroleum (BP) acquired the station from Mobil in May 1991 Information in BP files <br /> indicated that Mobil owned the site in May 1986 There is no documentation concerning previous <br /> USTs on the site Nearby properties noted during a site visit consist of a restaurant and parking lot <br /> north and northwest of the site, a strip mall to the east (across West Lane), a bank and restaurant <br /> to the south (across Hammer Lane), and an auto parts store to the west of the site Monitoring <br /> and sampling has been conducted at the site since 2002 Historical, as well as current, <br /> groundwater monitoring and sampling data are summarized in Table 1 <br /> Current Site Information <br /> Current Phase of Project Groundwater Monitoring <br /> Frequency of Monitoring and Sampling Quarter) MW-1 through MW-7 <br /> Is Free Product (FP) Present on Site? No <br /> FP Recovered This Quarter? NIA <br /> Cumulative FP Recovered to Date NIA <br /> Historic Range in Depth to Water, Q4- <br /> 2005 to 54 80 to 49 23 feet below ground surface (bgs) <br /> Q1-2006 <br /> Water Supply Wells within a 2,000-foot Public supply well 2,000 feet from site, private water <br /> radius and their Respective Direction supply well 300 feet from site <br /> I IBP-ARC0105 BP-COP Sites1111911ReportslQ1V1Rs111191 1 Q06 QM final doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.