My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:35:57 PM
Creation date
1/29/2020 11:46:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002009
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date July 23,2004 <br /> � Quarter 2nd Quarter,2004 <br /> QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 11191 <br /> Address 1469 West Hammer Lane, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466550 OL058 <br /> Primary Agency/Regulatory ID No Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property owned by Conoco Phillips <br /> WORK PERFORMED THIS QUARTER (Second 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> I <br /> QUARTERLY RESULTS SUMMARY (Second 2004): <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-7, Quarterly _ <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (1"P) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 49 56 to 51 56 feet below ground surface (bgs) <br /> Direction of Groundwater Flow Northeast to South <br /> Groundwater Gradient 0 002 to 0 005 feet/toot (ft/ft) _ <br /> ANALYTICAL DATA REVIEW: <br /> Please note that as of April 1, 2004, the laboratory has changed the carbon range for gasoline range organics (GRO) <br /> from C6 — C10 to C4 — C12 (to include the oxygenates) The resulting data may be impacted by the potential <br /> inclusion of additional total petroleum hydrocarbons as gasoline (TPHg) and non-TPHg analytes within the revised <br /> carbon range, which may result in a higher reported concentration Where the resulting GRO concentration is based <br /> on a single analyte(i e ,a non-TPHg analyte or a single TPHg analyte),the analyte will be identified if possible <br /> K lWpr ss\J5 BP ARC011119]1Quarterlyl2 QTR 04111191 GWMR 2Q04 doe Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.