Laserfiche WebLink
ARCO /BP WELL MONITORING DATA SHEET <br /> BTS # 0310 1-+- sH- ;)- Station# $P I it I i <br /> Sampler ��o,rr 94exp%a^ Date lo- 17l _ aoa3 <br /> Well I.D. r„� _ 3 Well Diameter 2 3 Z 6 8 <br /> Total Well Depth �a,,12 Depth to Water- T s. z c. <br /> Depth to Free Product. Thickness of Free Product (feet). <br /> Referenced to 4D Grade D O. Meter (if req`d): Yst HACH <br /> Well Diameter Mullipher Well Diameter Mullspher <br /> 1" 004 4" 065 <br /> 2" 016 6" 1 47 <br /> 3" 037 Other MEWS'"0 163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer CQR2Eble isaim, T <br /> e u Extraction Port - <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> 3. X -3 — 1o.IL Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (rnS or 4031) Gals Removed Observations <br /> 127 X1. 5 �•+ 12 '4 w 7. <br /> 123o 12. 41 �• a <br /> f? 169. 3 1243 ro. y $D % = 56• t9 <br /> � ait= S 4. ►'� <br /> Did well dewater? Yes d Gallons actually evacuated <br /> Sampling Time 17 .3,; Sampling Date <br /> Sample I D Mme. 3 Laboratory Pace � other <br /> Analyzed for l C T>ix MTBE TPll-D Other o,.y•s • '%'d E +ka.%o1 -Ly rra F.C. <br /> D O (if rcq'd)_ Pie-purge mg/L Post-purge t <br /> O R P (if leq'd) Pre-purge 111V Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-4555 <br />