Laserfiche WebLink
ARCO I BP WELL MONITORING DATA SHEET <br /> BTS #_ 03 10 r - sr►- X Station# 5p i I 1 -1 t <br /> Sampler. AtCV-e.a Date to- 1-1 - aaz>3 <br /> Well I.D M _ S' Well Diameter lb 3 4 6 8 <br /> Total Well Depth: 7¢ og Depth to Water s Y c, <br /> Depth to Free Product. Thickness of Free Product (feet) <br /> Referenced to CD Grade D.O Meter (if req'd) Ysi HACH <br /> well Diameler MsiiltplsSi Well Diameter mkllttTlier <br /> 1' 004 4" 065 <br /> 2" 016 6" 1 47 <br /> 3" 037 Other radms2'0163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Baileris osa6 ea <br /> i e Extraction Port - <br /> Electric Submersible Other <br /> Extraction Pump <br /> 011ier <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> • of screen Otherwise, the well must be purged <br /> y X — . Z C3215 <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Ternp(°F) pH (mS orjD) Gals Removed Observations <br /> 1160 foo.t. (0 9 ! Sa 1 • S <br /> ltoy (off 6 (a-$ <br /> ttog (Os.3 (0 .9 15* IS' $O <br /> Kr qe2ie r SS. f v <br /> Did well dewater? Yes (MD Gallons actually evacuated -f 5 <br /> Sampling Time 1 f t O Sampling Date ,4,_ ,-# - <br /> Sample I D Mw_ S Laboratory Pace <� Other <br /> Analyzed for H=am MTBE TPH-D Other ox-1'1c fte%d E +load rrA 'r-Q <br /> Ing mS� <br /> DO (if req d) Pie-purge /i. Post-purge <br /> rOR P (if req'd) Pre-purge mV Post-purge rnV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />