My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:40:04 PM
Creation date
1/29/2020 11:47:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002011
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IL—B.P GEM OIL COMPANY -TYPE A BELL of LADING <br /> SOURCE RECORD BELL OF LADING FOR NON- <br /> HAZARDOUS PURGEWATER RECOVERED FROM <br /> GROUNDWATER WELLS AT BP GEM OIL COMPANY p 1119 , <br /> FACILITIES IN THE STATE OF CALIFORNIA„ THE NON- Station# <br /> HAZARDOUS PURGE- WATER WHICH ' HAS BEEN <br /> RECOVERED FROM GROUND- WATER WELLS IS ! 1 -m.r,e r L, 15-to cute.. <br /> COLLECTED BY THE CONTRACTOR, MADE UP INTO Station Address <br /> LOADS OF <br /> APPROPRIATE SIZE AND HAULED BY <br /> DILLA RD ENVIRONMENTAL TO THE ALTAMONT <br /> LANDFILL AND RESOURCE RECOVERY FACILITY IN Total Gallons Collected From Groundwater Monitoring Wells <br /> LIVERMORE, CALIFORNIA <br /> The contractor performing this work is BLAINE TECH 3 0• s <br /> SERVICES, INC (BTS), 1680 Rogers Avenue, San Jose, CA <br /> 95112 (phone [4081 573-0555) Blame Tech Services, Inc is added equip any other <br /> authonzed by BP GEM OIL COMPANY to recover, collect, rinse water, 3- 5- adjustments <br /> apportion into loads the Non-Hazardous Well Purgewater that is <br /> drawn from wells at the BP GEM Oil Company facility indicated TOTAL GALS, loaded onto <br /> below and deliver that purgewater to BTS Transport routing of RECOVERED -3!f— BTS vehicle# q 6 <br /> the Non-Hazardous Well Purgewater may be direct from one BP <br /> GEM facility to the designated destination point, from one BP BTS event# tune date <br /> GEM facility to the designated destination point via another BP <br /> GEM facility; from a BP GEM facility to the designated o aro r,- - S N x } /0-1 <br /> destination point via the contractor's facility, or any combination •-- -- <br /> thereof The Non-Hazardous Well Purgewater is and remains the signature „r <br /> property of BP GEM Oil Company <br /> This Source Record BILL OF LADING was untiated to <br /> cover the recovery of Non-Hazardous Well Purgewater from wells <br /> at the BP GEM Oil Company facility described below RECD AT tune date <br /> STS, S-ar-ra.•+e..to <br /> unloaded by c � <br /> signature �' <br /> _ ��...c.�_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.