My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:05:41 PM
Creation date
1/29/2020 11:47:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002012
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date September 23,2003 <br /> Quarter 3`d Quarter,2003 <br /> BP QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 11191 <br /> Address 1469 West Hammer Lane, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466254 OL058 <br /> Primary Agency/Regulatory ID No Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property owned by Conoco Phillips <br /> WORK PERFORMED THIS QUARTER (Third 2003): <br /> I Groundwater samples were collected from site monitoring wells MW-I through MW-7 and were submitted for <br /> laboratory analyses <br /> 2 URS compiled and evaluated groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2003): <br /> 1 Groundwater samples will be collected from site monitoring wells and submitted for laboratory analyses <br /> 2 URS will compile and evaluate groundwater monitoring data <br /> QUARTERLY RESULTS SUMMARY (Third 2003): <br /> r <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-7 _ <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 49 60 to 51 62 feet below ground surface <br /> Direction of Groundwater Flow South-Southeast <br /> Groundwater Gradient 0 007 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • The reported results for TPHg in samples MW-1, MW-2, MW-3, and MW-5 are due to a discrete peak at C5 <br /> (probably MtBE)and have been refected accordingly <br /> • Elevated reporting limits were due to dilutions performed by the laboratory in order to quantitate a target <br /> analyte(s) <br /> K MPmcessV5 BP ARC0011911Quarterly�3 QTR WNI 1191 GWMR 3Q03 doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.