Laserfiche WebLink
ARCO /BP WELL MONITORING DATA SHE <br /> TS # v Station # 1� <br /> Sampler Date: <br /> Well I.D. _ Well Diameter. © 3 4 6 8 <br /> Total Well Depth: �ij Depth to Water <br /> Deptb to Free Product- Thickness of Free Product (feet)- <br /> Referenced to- Pvc Grade D O. Meter (if req'd)- YSI HACH <br /> Well�7jnmeter [t3 er Well Diameter <br /> 004 — 1]�tthtnlEer <br /> !" 4. <br /> 2" 0 !6 0 65 <br /> 6" 147 <br /> 31. 037 <br /> Qlhcr radius,'+U 163 <br /> Purge Method Bailer Sampling Method Bader <br /> Disposable Baile� Disposable Bader <br /> Middleburg Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> 0 of screen Otherwise, the well must be purged <br /> X 3 <br /> 2 Gals <br /> I Case Volume(Gals} Specified Volumes _ Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (ins o Gals Removed Observations <br /> is l <br /> ru <br /> Z - 2._ <br /> 7L Z. l <br /> Did well dewater? yes o Gallons actually evacuated: <br /> Sampling Time Sampling Date, <br /> 2- <br /> Sample <br /> Sample I D. Laboratory race a uoitt Other <br /> Analyzed for. F1=O� TE, T - TPH-D Other <br /> . (if req'd). Pre-purge Post-purge �,L/1 <br /> ORP (t f req'd} Pi a-purge m V Post-purge m V <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, GA 951.12 (408) 573-0555 <br />