Laserfiche WebLink
885 Jahns Drive <br /> a— ) Sequoia Morgan 1hil,CA 95037 <br /> mW Analytical (408)7769600 <br /> FAX(408)782-6308 <br /> www sequoialabs coir <br /> URS Corporation f 11 Project BP Hentage Site 911191,Stockton,CA <br /> 2870 Gateway Oaks Dr,Ste 300 ProjectNumber BP Hentage Site#11191,Stockton,CA Reported <br /> Sacramento CA,95833 Project Manager Vern Flarth 1I/04/02 09 31 <br /> ANALYTICAL REPORT FOR SAMPLES <br /> Sample ID Laboratory ID Matrix Date Sampled Date Received <br /> MW-1 MLJ0525-01 Water 10/11/02 13 45 10/15/02 17 10 <br /> MW-2 MLJ0525-02 Water 10/11/02 14 00 10/15/02 17 10 <br /> MW-3 MLJ0525-03 Water 10/11/02 14 35 10/15/02 17 10 <br /> MW-4 MLJO525-04 Water 10/11/02 14 15 10/15/02 17 10 <br /> Sequoia Analytical-Morgan Hill The results in this report apply to the samples analyzed in accordance with the chain <br /> 0 0*1 -� -pk of custody document This analytical report must be reproduced in its entirety <br /> Latonya Pelt,Project Manager 1 of 6 <br />