My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:33:37 PM
Creation date
1/29/2020 11:48:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002015
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Vi <br /> CAMBRIA • <br /> Water Sampling <br /> Water samples, if they are collected from the boring, are either collected using a driven <br /> Hydropunch®type sampler or are collected from the open borehole using bailers The ground water <br /> samples are decanted into the appropriate containers supplied by the analytic laboratory Samples <br /> are labeled,placed in protective foam sleeves,stored on crushed ice at or below 4°C,and transported <br /> under chain-of-custody to the laboratory Laboratory-supplied trip blanks accompany the samples <br /> and are analyzed to check for cross-contamination An equipment blank may be analyzed if non- <br /> dedicated sampling equipment is used <br /> Grouting <br /> If the borings are not completed as wells, the borings are fulled to the ground surface with cement <br /> grout poured or pumped through a trerrue pipe <br /> MONITORING WELL INSTALLATION, DEVELOPMENT AND SAMPLING <br /> , <br /> Well Construction and Surveying <br /> Ground water monitoring wells are installed to monitor ground water quality and deterrmne the <br /> ground water elevation, flow direction and gradient Well depths and screen lengths are based on <br /> ground water depth, occurrence of hydrocarbons or other compounds in the borehole, stratigraphy <br /> and State and local regulatory guidelines Well screens typically extend 10 to 15 ft below and 5 ft <br /> above the static water level at the time of drilling However, the well screen will generally not <br /> extend into or through a clay layer that is at least three ft thick <br /> Well casing and screen are flush-threaded, Schedule 40 PVC Screen slot size vanes according to <br /> the sediments screened,but slots are generally 0 010 or 0 020 inches wide A rinsed and graded sand <br /> occupies the annular space between the boring and the well screen to about one to two ft above the <br /> well screen A two ft thick hydrated bentonite seal separates the sand from the overlying sanitary <br /> surface seal composed of Portland type I,U cement <br /> Well-heads are secured by locking well-caps inside traffic-rated vaults finished flush with the ground <br /> surface A stovepipe may be installed between the well-head and the vault cap for additional <br /> security - - <br /> The well top-of-casing elevation is surveyed with respect to mean sea level and the well is surveyed <br /> for horizontal location with respect to an onsite or nearby offsite landmark <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.