My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:07:00 PM
Creation date
1/29/2020 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002016
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' r <br /> t <br /> • CAMBRIA <br /> Well Development <br /> Wells are generally developed using a combination of ground water surging and extraction Surging <br /> agitates the ground water and dislodges fine sediments from the sand pack After about ten minutes <br /> of surging,ground water is extracted from the well using bailing,pumping and/or reverse air-hftmg <br /> through an eductor pipe to remove the sediments from the well Surging and extraction continue until <br /> at least ten well-casing volumes of ground water are extracted and the sediment volume in the ground <br /> water is negligible This process usually occurs prior to installing the sanitary surface seal to ensure <br /> sand pack stabilization If development occurs after surface seal installation,then development occurs <br /> 24 to 72 hours after seat installation to ensure that the Portland cement has set up correctly <br /> All equipment is steam-cleaned prior to use and air used for air-lifting is filtered to prevent oil <br /> entrained in the compressed air from entering the well Wells that are developed using air-lift <br /> evacuation are not sampled until at least 24 hours after they are developed <br /> Ground Water Sampling <br /> Depending on local regulatory guidelines, three to four well-casing volumes of ground water are <br /> purged prior to sampling Purguig continues until ground water pH, conductivity, and temperature <br /> have stabilized Ground water samples are collected using bailers or pumps and are decanted into the <br /> appropriate containers supplied by the analytic laboratory Samples are labeled,placed in protective <br /> • foam sleeves, stored on crushed ice at or below 4°C, and transported under cham-of-custody to the <br /> laboratory Laboratory-supplied trip blanks accompany the samples and are analyzed to check for <br /> cross-contamination An equipment blank maybe analyzed if non-dedicated sampling equipment is <br /> used <br /> 3 of 3 <br /> F 1TEMPLATEISOPs1GW InstaUation doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.