Laserfiche WebLink
URS <br /> • Mr Harlin Knoll <br /> Senior Environmental Health Specialist <br /> San Joaquin County Environmental Health Department <br /> October 9, 2002 <br /> Page 2 <br /> SCOPE OF WORK <br /> To assess the vertical and lateral extent of petroleum impacted groundwater, URS proposes the <br /> installation of one deep on-site monitoring well and two shallow off-site monitoring wells at the <br /> locations indicated on Figure 2 Field activities will be conducted as described in the <br /> Supplemental Investigation Work Plan, with the exceptions discussed below <br /> Prior to initiating field activities, URS will obtain permission from Union Safe Deposit Bank to <br /> install two wells on the bank property and to collect quarterly groundwater samples from these <br /> wells <br /> The two off-site soil borings will be drilled in the parking lot of the Union Safe Deposit Bank to <br /> depths of approximately 60 feet bgs or 20 feet into groundwater <br /> One on-site soil boring will be drilled on the site property, between the station building and the <br /> underground storage tank (UST) complex This boring will be drilled to approximately 100 feet <br /> bgs The boring will be continuously cored to allow for accurate lithologic Iogging <br /> . The three soil borings will be converted to groundwater monitoring wells as described in the <br /> Supplemental Investigation Work Plan The shallow wells will be screened from approximately 30 <br /> to 60 feet bgs and the deep well will be screened over a five-foot interval in a deep permeable zone <br /> to be assessed in the field The actual well construction details will be based upon soil and <br /> groundwater conditions encountered in the field <br /> Groundwater Monitoring Well Development,Sampling,and Surveying <br /> After installation, the groundwater monitoring wells will be developed by rigorously surging over <br /> the length of the screen interval and by purging a minimum of ten casing volumes of water The <br /> wells will be surveyed to mean sea level by a licensed surveyor <br /> Groundwater samples will be collected from the newly installed groundwater monitoring wells a <br /> minimum of 48 hours after well development Groundwater samples will be analyzed for TPH-g <br /> and BTEX by EPA Method 8015/8021 and fuel oxygenates by EPA Method 8260B Attachment <br /> H presents detailed groundwater sampling and analysis procedures <br /> Report Preparation <br /> Fallowing receipt of the analytical results, a report will be prepared summarizing the results of the <br /> investigation Included in the report will be the well drilling and construction procedures, <br /> monitoring well construction specifications, and tabulated groundwater data <br /> K V5 BP ARCOU 1191/11191 WP Addendum doc <br />