My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:07:00 PM
Creation date
1/29/2020 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002016
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C A M B R I A <br /> SUPPLEMENTAL INVESTIGATION WORK PLAN <br /> BP Site No 11191 <br /> 1469 East Hammer Lane <br /> Stockton, California <br /> Cambria Project No 852-1709 <br /> June 21, 2002 <br /> INTRODUCTION <br /> Cambria Environmental Technology, Inc (Cambria) has prepared this Supplemental Investigation <br /> Work Plan (Work Plan) for the above-referenced BP Oil Company (BP) site In our <br /> March 29, 2002 Site Investigation Report, we recommended quarterly groundwater monitoring of <br /> the site wells, preparation of a Supplemental Investigation Work Plan following review of the <br /> second quarter 2002 monitoring results, and batch groundwater extraction This Work Plan <br /> describes our recommended scope of work to further define the extent of hydrocarbons and methyl <br /> tertiary butyl ether (MTBE) beneath the site The site background, recommended activities, and <br /> schedule are presented below <br /> SITE BACKGROUND <br /> Site Description• The site is an active 76-branded gasoline retail outlet located at the northwest <br /> corner of the intersection of Hammer Lane and West Lane in Stockton, California (see Figure 1) <br /> BP acquired the site as a gasoline retail outlet from Mobil Oil Corporation in 1989 In 1994, BP <br /> transferred the gasoline retail outlet to TOSCO Marketing Company (TOSCO) and has not <br /> operated the facility since that time <br /> The site is located in a commercial area An empty lot and Golf Land Arcade Park are located at <br /> the northeast and southeast corners of the Hammer Lane and West Lane intersection, respectively <br /> (see Figure 2) A Union Safe Deposit Bank is located on the southwest corner of the intersection <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.