Laserfiche WebLink
ttI <br /> I� <br /> BLAINE 1680 ROGERS AVENUE <br /> TECH SERVICES„ SAN JOSE, CA 95112-1105 <br /> (408) 573-7771 FAX <br /> } � �T T (408) 573-0555 PHONE <br /> J zowq CONTRACTOR'S LICENSE#746684 <br /> www blainetech conn <br /> w O <br /> I <br /> I May 5, 2002 <br /> Scott Hooton <br /> BP Oil Company <br /> 295 SW 41st Street, Bldg 13, Suite N <br /> Renton, WA 98055-4931 <br /> 2nd Quarter 2002 Monitoring at 11191 <br /> Second Quarter 2002 Groundwater Monitoring <br /> BP Service Station Number 11191 <br /> 1469 E Hammer Lane <br /> Stockton, CA <br /> Monitoring Performed on April 11, 2002 <br /> Groundwater Sampling Report 020411-BM-2 <br /> This report covers the routine monitoring of groundwater wells at this BP facility Blaine Tech <br /> Services, lne 's work at the site includes inspection, gauging, evacuation, purgewater <br /> containment, sample collection and sample handling in accordance with standard procedures that <br /> conform to Regional Water Quality Control Board requirements <br /> Routine field data collection includes depth to water, total well depth, thickness of any separate <br /> immiscible layer, water column volume, calculated purge volume, elapsed evacuation time, total <br /> volume of water removed, and standard water parameter instrument readings Sample material <br /> is collected, contained, stored, and transported to the laboratory in conformance with EPA <br /> standards Purgewater is, likewise, collected and transported to Seaport Petroleum Corporation <br /> I <br /> for disposal <br /> Basic field information is presented alongside analytical values excerpted from the laboratory <br /> report in the cumulative table of WELL DATA AND ANALYTICAL RESULTS The full <br /> analytical report for the most recent samples is located in the Analytical Appendix <br /> Blaine Tech Services,Inc Report No 020411-SM-2 2nd-Q 2002 Monitoring at BP 11191 <br />