My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:24:53 PM
Creation date
1/29/2020 11:50:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002018
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Site Investigation Report <br /> BP Oil Site No 11191 <br /> C A M B R I A Stockton, California <br /> • March 29, 2002 <br /> INVESTIGATION ACTIVITIES <br /> Water Supply Well Survey <br /> A Department of Water Resources (DWR) inquiry identified nine Well Driller's Reports for wells <br /> located within a 1-mile radius of the site City of Stockton water supply well No 13 is located <br /> approximately i/z-mile from the site, and was drilled to 440 feet bgs and sealed with cement grout <br /> from the surface to 101 feet bgs Three additional city water supply wells (No 15, test well No 15 <br /> and No 19), one irrigation well, and two domestic wells are located approximately 1 mile from the <br /> site The city wells range in depth from 431 to 600 feet bgs and were sealed with cement to <br /> 60-80 feet bgs The irrigation well was drilled to 350 feet bgs Sealing information was not <br /> available for the irrigation well The domestic wells were drilled to 200 and 232 feet bgs and <br /> sealed to 50 feet bgs with cement and bentonite, respectively <br /> Well Installation Activities <br /> . Scope of Work The planned site investigation activities included the installation of <br /> four groundwater monitoring wells Cambria's standard procedures for <br /> well installation are attached as Appendix B <br /> Personnel Present Sara Dwight, Cambria Scientist, was present for the installation of the <br /> monitoring wells, working under the supervision of Khaled Rahman, <br /> California Registered Geologist Harlin Knoll of the SJCPHS was <br /> onsite intermittently to inspect field activities <br /> Number of Wells Four onsite wells (MW-1, MW-2, MW-3 and MW-4) were installed <br /> Well Locations Well MW-1 was installed west of the northwestern dispenser islands, <br /> adjacent to previous borings B-4, B-5, and THP-2 Well MW-2 was <br /> installed west of the southeastern dispenser islands adjacent to <br /> previous boring B-3 Well MW-3 was installed north of the <br /> underground storage tanks adjacent to previous boring B-1 Well <br /> MW-4 was installed south of the underground storage tanks adjacent <br /> to previous boring B-2 (see Figure 2) <br /> • <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.