My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
ARCHIVED REPORTS_XR0002018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:24:53 PM
Creation date
1/29/2020 11:50:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002018
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLAINE <br /> 1680 ROGERS AVENUE <br /> TECH SERVICES„. SAN JOSE, CA 95112-1105 <br /> (408)573-7771 FAX <br /> ao£uTo (408)573-0555 PHONE <br /> zd° � CONTRACTOR'S LICENSE#746684 <br /> www blainatech com <br /> March 15, 2002 <br /> Scott Hooton <br /> BP Oil Company <br /> 295 SW 41 st Street, Bldg 13, Suite N <br /> Renton, WA 98055-4931 <br /> 1st Quarter 2002 Monitoring at 11191 <br /> First Quarter 2002 Groundwater Monitoring <br /> BP Service Station Number 11191 <br /> 1469 E Hammer Lane <br /> Stockton, CA <br /> Monitoring Performed on January 3, 10, and 23, 2002 <br /> Groundwater Sampling Report 020103-JB-1 <br /> This report covers the routine monitoring of groundwater wells at this BP facility Blaine Tech <br /> Services, Inc 's work at the site includes inspection, gauging, evacuation, purgewater <br /> containment, sample collection and sample handling in accordance with standard procedures that <br /> conform to Regional Water Quality Control Board requirements <br /> i <br /> Routine field data collection includes depth to water, total well depth, thickness of any separate <br /> i <br /> immiscible layer, water column volume, calculated purge volume, elapsed evacuation time, total <br /> volume of water removed, and standard water parameter instrument readings Sample material <br /> is collected, contained, stored, and transported to the laboratory in conformance with EPA <br /> standards Purgewater is, likewise, collected and transported to Seaport Petroleum Corporation <br /> for disposal <br /> Basic field information is presented alongside analytical values excerpted from the laboratory <br /> report in the cumulative table of WELL DATA AND ANALYTICAL RESULTS The full <br /> analytical report for the most recent samples is located in the Analytical Appendix <br /> • <br /> Blaine Tech Services, Inc Report No 020103-JB-1 1st-Q 2002 Monitoring at SP 11191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.