My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2900 - Site Mitigation Program
>
PR0505662
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:36:18 PM
Creation date
1/29/2020 11:54:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505662
PE
2950
FACILITY_ID
FA0006929
FACILITY_NAME
ARCO PRODUCTS CO #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y08-377- 0301 <br /> ARCO Products Compal <br /> Environmental Engineering <br /> 2155 South Bascom Avenue, Suite 20f� T�# <br /> 2 � t �A�Y " <br /> Campbell, California 95008 ., i.;rr; - ,� H 1 <br /> 55 KAR _ PM 1: 05 <br /> March 1, 1995 <br /> Ms. Diane Hinson <br /> San Joaquin Co. Public Health Services <br /> Environmental Health Division <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Re: ARCO facilities #5450 and #5569, Stockton, CA <br /> Dear Ms. Hinson: <br /> Earlier today we discussed ARCO's planned activities to replace the single wall <br /> product lines and fibertrench containment system with double wall fiberglass <br /> product lines at the above referenced ARCO facilities. AiRS 'C&My45009 <br /> I 7VWes�&terngaWtreet�niStocldon 'ARGO�fddiril�#.55694a `"at d'P <br /> a ,ler ;a e-'pt,Stocktdh. Although ARCO does not expect to find <br /> the soli eneath the fibertrench to be impacted by hydrocarbons, it is prudent to <br /> have an agreed upon workplan if soil contamination is discovered. <br /> ARCO's environmental consultant for facility#5450 will be Brown & Caldwell. <br /> and for facility#5569 it will be Emcon Associates. The environmental consultant <br /> at the site will take soil samples at the base of the piping trench after it has been <br /> excavated to the appropriate depth to install the double wall fiberglass product <br /> lines. These soil samples will be sampled every 20 feet and analyzed for TPHg <br /> and BETX in accordance with the RWQCB's Tri-Regional guidelines. Since <br /> these facilities have been constructed and operational after leaded gasoline <br /> sales were discontinued in California, lead will not be analyzed. If no <br /> contamination is found, the line replacement will proceed as planned. <br /> However, if minor contamination is discovered, small scale overexcavation will <br /> be attempted at the locations of the impacted soil. The decision to <br /> overexcavated will be determined in discussion with staff members of your <br /> department. Small scale overexcavation is not expected to exceed 100 cubic <br /> yards. This quantity of soil represents the excavation of 180 linear feet of 4 foot <br /> wide trench which has been overexcavated by 4 feet. Soil samples will again be <br /> obtained at the base of the overexcavation and analyzed. Overexcavated soil, <br /> along with the previously excavated soil will be analyzed for subsequent <br /> disposal at a Class 3 landfill or more secure landfill. <br /> AAW F'Pd,a6a Company s a i,of ADarboRichfieidCompary <br />
The URL can be used to link to this page
Your browser does not support the video tag.