Laserfiche WebLink
Task 2 - Well Installation <br /> The proposed ground water monitoring well will be installed to a depth of approximately 50 feet <br /> with the screened interval extending from 35 to 50 below ground surface (bgs). The well will <br /> be placed on the Parkwoods Shopping Center property approximately 10-feet south of the Arco <br /> monitoring well (MW-5), as shown on Figure 1. Well installation procedures are attached. <br /> Task 3 - Well Development and Sampling <br /> The new well will be developed using a bailer or suitable pump. Development will be conducted <br /> for about 2 to 3 hours or until the water is relatively sediment free. Development water will be <br /> contained in 55-gallon drums that will be stored in an area designated by site management. <br /> Following development, the well will be sampled using a Teflon bailer. Samples will be <br /> decanted from the bailer into appropriate sample containers, labeled, and placed in a cooled <br /> container for transport to the laboratory under chain-of-custody control. Sampling equipment <br /> will be cleaned prior to sampling. <br /> Samples will be analyzed for TPHg using EPA Method 5030/GCFID and BTEX using EPA <br /> Method 8020. <br /> Task 4 - Report Preparation <br /> Within two weeks of receiving the analytical results, we will submit a report describing the <br /> investigation and results of the laboratory analyses. Ground water analysis will be submitted <br /> under one week turnaround and verbal results will be provided as soon as they are available. <br /> We will provide the above referenced tasks as part of our proposal dated April 25, 1995 and <br /> authorized by you on April 1-7, 1995. The work will be conducted under the General Conditions <br /> and Schedule of Charges presented with the proposal. <br /> L198G PM=L.IuQ8988 <br /> 5-17-95 <br />