Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT" INFORMATION: <br /> i PROJECT NAME: y� tir�t 1� 1tt� �]�yi,ori PROJECT NUMEER: 7�A, ELL NO. <br /> PROJECT MANAGER: T��,�f _ TYPE OF WEL L: 1 Mani#grin <br /> 9 Extraction Other <br /> RE-CORDED BY: SAMPLED SY;__ .L#-,,,,f DATE: CSC-C- JC C i <br /> WELL. PURGING: INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> We!!C,,asing Diameter <br /> ,�2-inch 4-inch other <br /> �tler - Type ! <br /> 'Nell Total Depth Zt q'J feet below Top of Casing,TO ;= Pump - TypeC.,� rrt ", j <br /> Cther - Spec;fy <br /> nC <br /> ++ epth to Water 3 �j feet below Top of Casing,WL Hydrocarbon Odors: <br /> Water Column Length ' `-"feet Yes _ %No <br /> e <br /> A,. p=urge Volume Calculation (Water Column Length x Muitipiier x No.Volumes = Calculated Purge Volume) <br /> X ' f f X Calculated Purge Volume oallons <br /> (WCL) (Multiplier) ) (No.Volumes) Actual Pure Volume = — - <br /> 4 ��2 _ Gallons <br /> V <br /> Muttioiier: fCasina diameter, ffnchesl> Galfansllinear footleZ=,Q:17 4'=0.66: 6=1;S: 8:=:2=5 <br /> Groundwater Parameter Measurement: Meter TypeCalibrated.✓_Yes No <br /> i.. <br /> TIME E:.APSED i FLGWRATE I D7N off I I �T= 7—PREIC17Y R��O� ^�i41 iJ <br /> 'S <br /> TIME (GPM) (ft) anhosfcat deg C (NTU) mV <br /> tlM F 1`i i`YA4 '\ <br /> `!ZZ -Z ��. � � �ick+ b „, I <br /> -C,0 'I ,qt ZZ, <br /> ,. � 4-f10� C zn; n Z_ <br /> i <br /> 6 _st i s zx 2,�l 7, Y II, f I Z7. <br /> I I i I f l <br /> LW I I I <br /> LM <br /> 1v= <br /> I <br /> I I I <br /> ! I I I <br /> I � I <br /> I I I 1 I <br /> I I <br /> A<S0C 4TE3 INC <br /> ENVIRONMENTAL,GEO7tCHNICALA YDMR7 -iiALSPROFESMONALS <br /> I.r <br />