My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
2900 - Site Mitigation Program
>
PR0508461
>
ARCHIVED REPORTS_XR0002833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 4:18:48 PM
Creation date
1/29/2020 3:38:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002833
RECORD_ID
PR0508461
PE
2950
FACILITY_ID
FA0008092
FACILITY_NAME
CONTINENTAL GRAIN CO
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
01
SITE_LOCATION
1805 HARBOR ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> GEOMATR1X <br /> . ALTERNATIVE 1 <br /> NATURAL ATTENUATION Page 1 of 1 <br /> PRELIMINARY COST ESTIMATE <br /> Former ContiGroup Grain Elevator <br /> 1805 Harbor Street <br /> Stockton, California <br /> Assumption <br /> 1 Free product removal will be performed once per month for six months from 2 new extraction wells <br /> installed in the area of the former tank exacavation <br /> 2 Quarterly monitoring will be performed for two years during the site closure process <br /> Notes <br /> The following costs were estumted based on a conceptual design of the remedial action and readily available cost <br /> information on labor and material typical for similar projects The actual costs for this project may vary depending on the <br /> final design,contract bids,agencies'requirements, and/or the availability of equipment,materials, and/or contractors at the <br /> time of final remedial action design construction and/or implementation <br /> TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST S SUBTOTAL$ <br /> NATURAL ATTENUATION <br /> ' Free Product Removal and Risk Assessment 34,000 <br /> Install 2 extraction wells 2 each 2,500 5,000 <br /> lieVacuum truck pumping of wells, disposal 6 each 1,500 9,000 <br /> Human Health Risk Assessment 1 lump sum 20,000 20,000 <br /> Site Closure Activities 66,100 <br /> County well abandonment permit 1 lump sum 500 500 <br /> Quarterly groundwater monitoring 2 year 16,000 32,000 <br /> Abandon monitoring wells 1 lump sum 10,000 10,000 <br /> Field work oversight and coordination 30 hr 120 3,600 <br /> Site closure request report 1 lump sum 20,000 20,000 <br /> NATURAL ATTENUATION $ 100,100 <br /> ACTIVITY QUANTITY UNIT UNIT S COST$ SUBTOTAL$ <br /> 15%project management cost 015 $ 100,100 15,000 <br /> 20%contingency cost 02 $ 100,100 25,000 <br /> TOTAL $ 140,100 <br /> 1 IDoc_Safe19000s199631CAKAppS Alternatives As 1016/20049 51 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.