My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002833
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
2900 - Site Mitigation Program
>
PR0508461
>
ARCHIVED REPORTS_XR0002833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 4:18:48 PM
Creation date
1/29/2020 3:38:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002833
RECORD_ID
PR0508461
PE
2950
FACILITY_ID
FA0008092
FACILITY_NAME
CONTINENTAL GRAIN CO
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
01
SITE_LOCATION
1805 HARBOR ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • 0 <br /> GEOMATRIX <br /> ' ALTERNATIVE 3 <br /> TANK AREA EXCAVATION TO 1-FOOT BELOW WATER TABLE <br /> ' PRELIMINARY COST ESTIMATE Page 1 of 2 <br /> Former ContiGroup Grain Elevator <br /> 1805 Harbor Street <br /> ' Stockton, California <br /> Assumptions <br /> ' 1 Extent of excavation on property up to chain-link fence <br /> 2 Excavation area is approximately 1,050-ftz(3541 x 30-ft) The top 10-ft of overburden soil to be removed,stockpiled, <br /> and tested Overburden soil(390 cy)assumed to be non-hazardous and used to backfill excavation Excavation depth <br /> is 13-feet bgs and affected soil volume is approximately 117 cy(200 tons @ 125 Ibs/ft3 density) <br /> ' 3 Excavation will be shored for 30-feet deep soil removal <br /> 4 Groundwater depth approximately 12-ft bgs No buried utilities assumed <br /> 5 Following excavation,place oxygen enhancing material in completed excavation prior to backfill <br /> 6 Half existing 14-ft x 20-ft concrete pad to be removed Assumed 6-mch thickness Concrete debris estimated at 6 5 <br /> tons to be recycled <br /> 7 No asphalt pavement to be removed <br /> 8 No confirmation sampling of excavation <br /> 9 Free product(if present)will be removed from excavation using a vacuum truck <br /> 10 For cost estimating purposes,the affected soil is assumed to be transported to the Class II Forward Landfill in <br /> Stockton, CA, for disposal Soil waste to be profiled based on existing soil data prior to excavation mobilization <br /> 11 Import fill from local source placed to ground surface <br /> ' 12 Top 10-ft of stockpiled overburden soils to be sampled and analyzed for TPH-diesel and TPH-gasoline One <br /> composite sample per 100 cy of soil <br /> 13 The conceptual design for this alternative(demo, shoring,excavation, and re-construction)was developed for cost <br /> analysis purposes only,additional evaluations will be necessary for the final system design if this alternative is <br /> implemented <br /> 14 No air monitoring required <br /> 15 No dust control or vapor suppressant required <br /> ' 16 Municipal water supply available on-site <br /> Notes <br /> The following costs were estimated based on a conceptual design of the remedial action and readily available cost <br /> ' information on labor and material typical for similar projects The actual costs for this project may vary depending on the <br /> final design, contract bids,agencies' requirements, and/or the availability of equipment, materials, and/or contractors at the <br /> time of final remedial action design, construction, and/or implementation <br /> ' TASK <br /> ACTIVITY QUANTITY UNIT UNITS COST$ SUBTOTAL$ <br /> PLANNING and PREPARATION <br /> re- field activities 20,000 <br /> surveying 1 lump sum 5,000 5,000 <br /> workplan-excavation,disposal I lump sum 15,000 15,000 <br /> ' PLANNING and PREPARATION SUBTOTAL $ 20,000 <br /> ' EXCAVATION and BACKFILL <br /> Pre- eld activities 28,000 <br /> design shoring 1 lump sum 5,000 5,000 <br /> ' remove concrete slab and recycle debris 1 lump sum 5,000 5,000 <br /> decommission existing monitoring well 1 ea 5,000 5,000 <br /> remove overhead power line&pole 1 lump sum 8,000 8,000 <br /> pre-profile soil waste 1 lump sum 5,000 5,000 <br /> I\Doc Safe19000s\9963\CARAppB Altematrves As 10/6120043 15 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.