1 • • <br /> ALTERNATIVE 4 GEO� <br /> C3ECMATRIX <br /> TANK AREA EXCAVATION <br /> PRELIMINARY COST ESTIMATE <br /> Former ContiGroup Grain Elevator Page 2 of 2 <br /> 1805 Harbor Street <br /> Stockton California <br /> TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> DEWATERING and TREATMENT SYSTEM(cont'd) <br /> Other mise 39,000 <br /> treatment system installation,startup,operations 15 day 1,500 22,500 <br /> laboratory analysis of discharge water samples 5 event 500 2,500 <br /> system decommissioning I lump sum 10,000 10,000 <br /> spent GAC pickup and disposal 1 lump sum 4,000 4,000 <br /> DEWATERING and TREATMENT SYSTEM SUBTOTAL S 109,000 <br /> 1 TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> EXCA VA TION an d BACKFILL <br /> pre-Feld activities 36,000 <br /> stormwater controls installed 1 lump sum 5,000 5,000 <br /> design shoring 1 lump sum 8,000 8,000 <br /> ' remove concrete slab and recycle debris 1 lump sum 5,000 5,000 <br /> decommission existing monitoring well 1 ea 5,000 5,000 <br /> remove overhead power line&pole 1 lump sum 8,000 8,000 <br /> pre-profile soil waste 1 lump sum 5,000 5,000 <br /> lieexcavation 220,540 <br /> mob/demo 1 lump sum 15,000 15,000 <br /> install and remove shoring 1 lump sum 97,500 97,500 <br /> excavate 390 cy overburden soil and stockpile 390 cubic yard 12 4,680 <br /> j excavate 780 cy affected soil 780 cubic yard 15 11,700 <br /> offsite transportation and disposal of affected soil 1325 ton 42 55,650 <br /> kocate and test source of backfill soil 1 lump sum 5,000 5,000 <br /> sample and test stockpiled overburden soil 4 ea 250 1,000 <br /> move,place,and compact overburden soil 390 cubic yard 9 3,510 <br /> import fill purchase,transport,place,compact 1325 ton 20 26,500 <br /> I Other mise 37,500 <br /> field work oversight and coordination 15 days 1,500 22,500 <br /> mise field equipment 1 lump sum 5,000 5,000 <br /> replace utility pole and power line 1 lump sum 10,000 10,000 <br /> EXCA VA TION and BACKFILL SUBTOTAL $ 294,040 <br /> TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> 15%protect management cost 0 15 438,040 65,700 <br /> 20%contingency cost 02 438,040 109,500 <br /> TOTAL $ 613,240 <br /> • <br /> ' 1 U)0c_Sa(e5900W99631CAP1AppB Altema4ves As 1016/20D49 52 AM <br />