<br /> ACTIVCTY-ALTERNATIVE A 1 Range-Low Range-High
<br /> PLANNING AND PREPARATION
<br /> ' Stormwater Permit N/A NIA
<br /> Surveying N/A N/A
<br /> Workplan $3,50000 $5,000
<br /> ' INSTALL DEWATERING/TREATMENT SYSTEM
<br /> Discharge fee $3,00000 $3,50000
<br /> rSystem design $1,00000 $2,00000
<br /> USA-utrinty locates $30000 $50000
<br /> 1 Install piping,instrumentation(flow meter,LEL meter) $7,00000 $9,00000
<br /> Dewatering purnps/transfer pumps(set power) $5,000,00 $6,00000
<br /> ' Holding tanks $1,50000 $3,00000
<br /> Carbon system(based on a i-month rental fee) $3,50000 S5,00000
<br /> Lab analysis for discharge $2,50000 $3,50000
<br /> System demoh/spent carbon recycling 53,00000 $5,00000
<br /> EXCAVATION AND BACKFILLING
<br /> ' Stormwater controls $1,00000 $2,00000
<br /> Design shonng Included Below
<br /> ' Removeldispose concrete slab S1,00000 $2,00000
<br /> Destruction of morutonng well S2,00000 $3,00000
<br /> Remove power line and power pole S2,00000 $2,50000
<br /> Soni waste profile S2,00000 $2,50000
<br /> acavation of soil backfnllrng/transportation of impacted soil S91,22612 $99,51941
<br /> ' Disposal of impacted soil S22,96530 $26,49842
<br /> Sod sampling/analysis $5,50000 S8,00000
<br /> ' Project oversight $7,00000 $9,00000
<br /> Compaction testing $2,50000 $3,50000
<br /> ' Replace power pole $2,00000 $2,50000
<br /> Shoring/shoring placement S85,00000 $95,00000
<br /> rTOTAL BUDGET COST ESTIMATE $254,49142 $298,51783